Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2025
Principal Product Industrial Coated Fabrics
NAICS 313320 - Fabric Coating Mills
SIC 2295 - Coated Fabrics, Not Rubberized
Sales $5,000,000-$10,000,000
# of Employees 46
Plant Area (Sq.Ft.) 72,500
Annual Production 1 Units
Production Hrs. Annual 4,420
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,940 1,406,400 kWh $0.12
Natural Gas $83,230 5,564 MMBtu $14.96
TOTAL ENERGY COSTS $254,170
RECOMMENDED SAVINGS* $99,863 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,596
Cost:
$135
$1,596 13,081 - - $1,596
13,081
kWh
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,511
Cost:
$500
$4,511 36,978 - - $4,511
36,978
kWh
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$427
Cost:
$50
$427 3,504 - - $427
3,504
kWh
-
-
MMBtu
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$24,849
Cost:
$20,250
- - $24,849 1,661 -
-
kWh
$24,849
1,661
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,396
Cost:
$9,990
$5,396 44,227 - - $5,396
44,227
kWh
-
-
MMBtu
06: 2.3513 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS Savings:
$3,451
Cost:
$15,964
$3,451 28,288 - - $3,451
28,288
kWh
-
-
MMBtu
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$51,703
Cost:
$514,800
$51,703 423,797 - - $51,703
423,797
kWh
-
-
MMBtu
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$7,930
Cost:
$80,003
$7,930 65,000 - - $7,930
65,000
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$99,863
Cost:
$641,692
$75,014 614,875 $24,849 1,661 $75,014
614,875
kWh
$24,849
1,661
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas