IAC logo
IAC Assessment: LT0078
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0078
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1986
Principal Product PROCESSED COTTONSEED
NAICS n/a
SIC 2074 - Cottonseed Oil Mills
Sales $10,000,000-$50,000,000
# of Employees 62
Plant Area (Sq.Ft.) 0
Annual Production 78,000 Tons
Production Hrs. Annual 7,056
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $455,094 8,926,143 kWh $0.05
Natural Gas $189,017 47,569 MMBtu $3.97
TOTAL ENERGY COSTS $644,111
RECOMMENDED SAVINGS* $18,513 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,278
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$980
Cost:
-
- - $1,580 393 $(-600) - -
-
kWh
$1,580
393
MMBtu
$(-600)
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,621
Cost:
$2,905
$3,621 75,909 - - - - $3,621
75,909
kWh
-
-
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$703
Cost:
$300
$624 18,171 $79 20 - - $624
18,171
kWh
$79
20
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,676
Cost:
-
$1,676 35,170 - - - - $1,676
35,170
kWh
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$11,298
Cost:
$2,158
$11,298 237,104 - - - - $11,298
237,104
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$235
Cost:
$44
$235 4,982 - - - - $235
4,982
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,513
Cost:
$5,407
$17,454 371,336 $1,659 413 $(-600) - $17,454
371,336
kWh
$1,659
413
MMBtu
$(-600)
-
$
TOTAL IMPLEMENTED Savings:
$18,278
Cost:
$5,363
$17,219 366,354 $1,659 413 $(-600) - $17,219
366,354
kWh
$1,659
413
MMBtu
$(-600)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes