IAC Assessment: LT0093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1987
Principal Product LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 78
Plant Area (Sq.Ft.) 0
Annual Production 29,000 Thousand Feet
Production Hrs. Annual 2,500
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $229,317 3,898,007 kWh $0.06
Natural Gas $1,989 415 MMBtu $4.79
Wood $906,024 453,014 MMBtu $2.00
TOTAL ENERGY COSTS $1,137,330
RECOMMENDED SAVINGS* $648,343 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,258
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$25,500
Cost:
$2,500
- - $25,500 12,750 - - -
-
kWh
$25,500
12,750
MMBtu
-
-
$
02: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$609,085
Cost:
-
$9,085 156,800 - - $600,000 - $9,085
156,800
kWh
-
-
MMBtu
$600,000
-
$
03: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$408
Cost:
$25,000
- - $408 204 - - -
-
kWh
$408
204
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,610
Cost:
$5,000
- - $1,610 805 - - -
-
kWh
$1,610
805
MMBtu
-
-
$
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$5,720
Cost:
$3,458
- - $5,720 2,860 - - -
-
kWh
$5,720
2,860
MMBtu
-
-
$
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,200
Cost:
$420
- - $3,200 1,600 - - -
-
kWh
$3,200
1,600
MMBtu
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,820
Cost:
$6,471
$2,820 43,962 - - - - $2,820
43,962
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$648,343
Cost:
$42,849
$11,905 200,762 $36,438 18,219 $600,000 - $11,905
200,762
kWh
$36,438
18,219
MMBtu
$600,000
-
$
TOTAL IMPLEMENTED Savings:
$39,258
Cost:
$42,849
$2,820 43,962 $36,438 18,219 - - $2,820
43,962
kWh
$36,438
18,219
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes