IAC logo
IAC Assessment: LT0103
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0103
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1987
Principal Product ELECTRIC CABLE
NAICS n/a
SIC 3643 - Current-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 4,800 Tons
Production Hrs. Annual 6,000
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $321,414 5,582,063 kWh $0.06
Natural Gas $76,795 18,931 MMBtu $4.06
TOTAL ENERGY COSTS $398,209
RECOMMENDED SAVINGS* $18,100 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,100
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,460
Cost:
-
- - $4,660 1,150 $(-1,200) - -
-
kWh
$4,660
1,150
MMBtu
$(-1,200)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$812
Cost:
$275
$812 14,947 - - - - $812
14,947
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,126
Cost:
$84
$5,550 115,768 - - $576 - $5,550
115,768
kWh
-
-
MMBtu
$576
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$162
Cost:
$75
$162 3,224 - - - - $162
3,224
kWh
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$532
Cost:
$855
$532 11,137 - - - - $532
11,137
kWh
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,210
Cost:
$1,390
$4,210 97,890 - - - - $4,210
97,890
kWh
-
-
MMBtu
-
-
$
07: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$190
Cost:
$161
- - $190 47 - - -
-
kWh
$190
47
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$818
Cost:
$723
- - $818 202 - - -
-
kWh
$818
202
MMBtu
-
-
$
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,790
Cost:
$665
- - $1,790 253 - - -
-
kWh
$1,790
253
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,100
Cost:
$4,228
$11,266 242,966 $7,458 1,652 $(-624) - $11,266
242,966
kWh
$7,458
1,652
MMBtu
$(-624)
-
$
TOTAL IMPLEMENTED Savings:
$18,100
Cost:
$4,228
$11,266 242,966 $7,458 1,652 $(-624) - $11,266
242,966
kWh
$7,458
1,652
MMBtu
$(-624)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes