IAC logo
IAC Assessment: LT0128
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0128
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1988
Principal Product PRESTRESSED CONCRETE
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 9,000 Pieces
Production Hrs. Annual 5,935
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,296 125,440 kWh $0.11
Natural Gas $47,235 11,158 MMBtu $4.23
TOTAL ENERGY COSTS $61,531
RECOMMENDED SAVINGS* $14,960 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,222
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,210
Cost:
$600
- - $2,210 522 - - -
-
kWh
$2,210
522
MMBtu
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,334
Cost:
$2,500
- - $5,334 1,261 - - -
-
kWh
$5,334
1,261
MMBtu
-
-
$
03: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$476
Cost:
$350
- - $476 113 - - -
-
kWh
$476
113
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,670
Cost:
$11,000
- - $5,160 1,220 $510 - -
-
kWh
$5,160
1,220
MMBtu
$510
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$315
Cost:
$550
- - $315 74 - - -
-
kWh
$315
74
MMBtu
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$339
Cost:
$600
$339 7,913 - - - - $339
7,913
kWh
-
-
MMBtu
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$68
Cost:
$180
$68 586 - - - - $68
586
kWh
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$176
Cost:
-
$176 879 - - - - $176
879
kWh
-
-
MMBtu
-
-
$
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$177
Cost:
$150
$177 4,103 - - - - $177
4,103
kWh
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$195
Cost:
$49
$210 3,224 - - $(-15) - $210
3,224
kWh
-
-
MMBtu
$(-15)
-
$
TOTAL RECOMMENDED Savings:
$14,960
Cost:
$15,979
$970 16,705 $13,495 3,190 $495 - $970
16,705
kWh
$13,495
3,190
MMBtu
$495
-
$
TOTAL IMPLEMENTED Savings:
$9,222
Cost:
$4,799
$902 16,119 $8,335 1,970 $(-15) - $902
16,119
kWh
$8,335
1,970
MMBtu
$(-15)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes