Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1985 |
Principal Product | SPECIALTY FABRICS |
NAICS | n/a |
SIC | 2231 - Broadwoven Fabric Mills, Wool |
Sales | $10,000,000-$50,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 3,459,600 Pounds |
Production Hrs. Annual | 3,366 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $569,667 | 8,258,500 | kWh | $0.07 |
LPG | $140,235 | 25,149 | MMBtu | $5.58 |
Fuel Oil #6 | $512,709 | 91,148 | MMBtu | $5.63 |
TOTAL ENERGY COSTS | $1,222,611 | |||
RECOMMENDED SAVINGS* | $298,351 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,387 |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Fuel Oil #6 | Administrative Changes | Electricity Usage | LPG | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $51,867 Cost: $52,000 |
- | - | - | - | $51,867 | 9,221 | - | - |
- - kWh |
- - MMBtu |
$51,867 9,221 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.5191 MODIFY DYE BECK |
Savings: $4,749 Cost: $1,800 |
- | - | - | - | $4,749 | 845 | - | - |
- - kWh |
- - MMBtu |
$4,749 845 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT |
Savings: $41,282 Cost: $82,500 |
$51,258 | 742,966 | - | - | $(-9,976) | (-1,775) | - | - |
$51,258 742,966 kWh |
- - MMBtu |
$(-9,976) (-1,775) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $173,755 Cost: $126,200 |
$138,690 | 2,009,965 | - | - | $14,965 | 2,658 | $20,100 | - |
$138,690 2,009,965 kWh |
- - MMBtu |
$14,965 2,658 MMBtu |
$20,100 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $11,311 Cost: $24,900 |
- | - | $11,311 | 2,027 | - | - | - | - |
- - kWh |
$11,311 2,027 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,902 Cost: $2,400 |
$14,902 | 216,002 | - | - | - | - | - | - |
$14,902 216,002 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $485 Cost: $120 |
$485 | 7,034 | - | - | - | - | - | - |
$485 7,034 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $298,351 Cost: $289,920 |
$205,335 | 2,975,967 | $11,311 | 2,027 | $61,605 | 10,949 | $20,100 | - | $205,335 2,975,967 kWh |
$11,311 2,027 MMBtu |
$61,605 10,949 MMBtu |
$20,100 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,387 Cost: $2,520 |
$15,387 | 223,036 | - | - | - | - | - | - | $15,387 223,036 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Fuel Oil #6 | Administrative Changes | Electricity Usage | LPG | Fuel Oil #6 | Administrative Changes |