IAC logo
IAC Assessment: MA0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1985
Principal Product WOOL & SYNTHETIC YARN
NAICS n/a
SIC 2284 - Thread Mills
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 0
Annual Production 4,700,000 Pounds
Production Hrs. Annual 6,500
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $325,178 3,521,688 kWh $0.09
Natural Gas $175 18 MMBtu $9.72
Fuel Oil #6 $59,501 11,631 MMBtu $5.12
TOTAL ENERGY COSTS $384,854
RECOMMENDED SAVINGS* $72,643 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $944
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6
$ kWh $ MMBtu $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$944
Cost:
$325
$944 10,258 - - - - $944
10,258
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,879
Cost:
$470
$5,436 58,910 - - $(-557) (-109) $5,436
58,910
kWh
-
-
MMBtu
$(-557)
(-109)
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$44,783
Cost:
$14,362
$57,854 626,612 $(-13,071) (-2,673) - - $57,854
626,612
kWh
$(-13,071)
(-2,673)
MMBtu
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,809
Cost:
$43,813
$20,809 226,260 - - - - $20,809
226,260
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$203
Cost:
$161
$203 2,345 - - - - $203
2,345
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,025
Cost:
$1,040
$1,025 11,137 - - - - $1,025
11,137
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$72,643
Cost:
$60,171
$86,271 935,522 $(-13,071) (-2,673) $(-557) (-109) $86,271
935,522
kWh
$(-13,071)
(-2,673)
MMBtu
$(-557)
(-109)
MMBtu
TOTAL IMPLEMENTED Savings:
$944
Cost:
$325
$944 10,258 - - - - $944
10,258
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6