IAC logo
IAC Assessment: MA0036
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0036
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1985
Principal Product NYLON & POLYESTER CLOTH
NAICS n/a
SIC 2241 - Narrow Fabric Mills
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 7,200
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,201,805 14,084,994 kWh $0.09
Fuel Oil #6 $183,692 35,659 MMBtu $5.15
TOTAL ENERGY COSTS $1,385,497
RECOMMENDED SAVINGS* $34,743 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,352
Cost:
$550
$1,352 15,826 - - - - $1,352
15,826
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,279
Cost:
$476
$13,279 154,162 - - - - $13,279
154,162
kWh
-
-
MMBtu
-
-
$
03: 2.7122 DISCONNECT BALLASTS Savings:
$2,457
Cost:
$1,250
$2,457 28,722 - - - - $2,457
28,722
kWh
-
-
MMBtu
-
-
$
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$450
Cost:
$1,200
$450 5,275 - - - - $450
5,275
kWh
-
-
MMBtu
-
-
$
05: 3.6121 BURN WASTE PAPER FOR HEAT Savings:
$9,651
Cost:
$9,075
- - $8,151 1,351 $1,500 - -
-
kWh
$8,151
1,351
MMBtu
$1,500
-
$
06: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$2,006
Cost:
$2,027
$2,006 23,447 - - - - $2,006
23,447
kWh
-
-
MMBtu
-
-
$
07: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,548
Cost:
$15,000
$5,548 - - - - - $5,548
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$34,743
Cost:
$29,578
$25,092 227,432 $8,151 1,351 $1,500 - $25,092
227,432
kWh
$8,151
1,351
MMBtu
$1,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings