IAC logo
IAC Assessment: MA0048
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0048
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1985
Principal Product ICE CREAM
NAICS n/a
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 0
Annual Production 2,000,000 Pieces
Production Hrs. Annual 0
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $165,970 1,083,529 kWh $0.15
Fuel Oil #2 $6,597 977 MMBtu $6.75
TOTAL ENERGY COSTS $172,567
RECOMMENDED SAVINGS* $12,731 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,228
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$592
Cost:
$180
$592 6,448 - - $592
6,448
kWh
-
-
MMBtu
02: 2.1222 INSTALL TURBULATORS Savings:
$636
Cost:
$2,200
- - $636 94 -
-
kWh
$636
94
MMBtu
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$728
Cost:
$1,700
- - $728 27 -
-
kWh
$728
27
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,960
Cost:
$2,710
$(-253) (-2,638) $3,213 476 $(-253)
(-2,638)
kWh
$3,213
476
MMBtu
05: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$4,082
Cost:
$2,095
$4,082 44,256 - - $4,082
44,256
kWh
-
-
MMBtu
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$3,733
Cost:
$9,000
$3,733 - - - $3,733
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$12,731
Cost:
$17,885
$8,154 48,066 $4,577 597 $8,154
48,066
kWh
$4,577
597
MMBtu
TOTAL IMPLEMENTED Savings:
$1,228
Cost:
$2,380
$592 6,448 $636 94 $592
6,448
kWh
$636
94
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2