IAC Assessment: MA0120
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1988
Principal Product ELECTRICAL COMPONENTS
NAICS n/a
SIC 3629 - Electrical Industrial Apparatus, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 7,250,000 Pieces
Production Hrs. Annual 6,000
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $328,552 4,599,062 kWh $0.07
LPG $9,458 1,055 MMBtu $8.96
TOTAL ENERGY COSTS $338,010
RECOMMENDED SAVINGS* $102,289 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,682
Cost:
$70
$3,682 67,116 - - $3,682
67,116
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$870
Cost:
$542
$870 12,016 - - $870
12,016
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$962
Cost:
$231
$962 12,309 - - $962
12,309
kWh
-
-
MMBtu
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$25,643
Cost:
$42,500
$25,643 604,631 - - $25,643
604,631
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,063
Cost:
$9,516
$10,063 140,387 - - $10,063
140,387
kWh
-
-
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,845
Cost:
$1,275
$2,845 74,443 - - $2,845
74,443
kWh
-
-
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$36,657
Cost:
$46,930
$74,279 1,046,014 $(-37,622) (-4,199) $74,279
1,046,014
kWh
$(-37,622)
(-4,199)
MMBtu
09: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,073
Cost:
$295
$2,073 - - - $2,073
-
kWh
-
-
MMBtu
10: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$3,650
Cost:
$6,000
$3,650 - - - $3,650
-
kWh
-
-
MMBtu
11: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$15,844
Cost:
-
$26,101 142,732 $(-10,257) (-1,145) $26,101
142,732
kWh
$(-10,257)
(-1,145)
MMBtu
TOTAL RECOMMENDED Savings:
$102,289
Cost:
$107,359
$150,168 2,099,648 $(-47,879) (-5,344) $150,168
2,099,648
kWh
$(-47,879)
(-5,344)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage LPG Electricity Usage LPG