Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1989
Principal Product TANTALUM CAPACITORS
NAICS n/a
SIC 3675 - Electronic Capacitors
Sales $10,000,000-$50,000,000
# of Employees 148
Plant Area (Sq.Ft.) 0
Annual Production 20,000,000 Pieces
Production Hrs. Annual 5,880
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $212,993 2,589,097 kWh $0.08
LPG $3,810 396 MMBtu $9.62
Fuel Oil #2 $12,326 2,316 MMBtu $5.32
TOTAL ENERGY COSTS $229,129
RECOMMENDED SAVINGS* $15,996 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,986
#|Description Savings
Cost
Status Electricity Usage LPG Fuel Oil #2 Electricity Usage LPG Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,378
Cost:
$527
$1,378 16,706 - - - - $1,378
16,706
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$7,925
Cost:
$40,371
$4,680 66,530 - - $3,245 610 $4,680
66,530
kWh
-
-
MMBtu
$3,245
610
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,765
Cost:
$2,300
$2,210 19,637 - - $(-445) (-84) $2,210
19,637
kWh
-
-
MMBtu
$(-445)
(-84)
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,320
Cost:
$18,000
$8,130 98,769 $(-3,810) (-396) - - $8,130
98,769
kWh
$(-3,810)
(-396)
MMBtu
-
-
MMBtu
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$208
Cost:
-
- - - - $208 39 -
-
kWh
-
-
MMBtu
$208
39
MMBtu
06: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$400
Cost:
-
$400 4,982 - - - - $400
4,982
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$15,996
Cost:
$61,198
$16,798 206,624 $(-3,810) (-396) $3,008 565 $16,798
206,624
kWh
$(-3,810)
(-396)
MMBtu
$3,008
565
MMBtu
TOTAL IMPLEMENTED Savings:
$1,986
Cost:
$527
$1,778 21,688 - - $208 39 $1,778
21,688
kWh
-
-
MMBtu
$208
39
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage LPG Fuel Oil #2 Electricity Usage LPG Fuel Oil #2