IAC logo
IAC Assessment: MA0153
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0153
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1989
Principal Product FLUID MILK PRODUCTS
NAICS n/a
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 20,000 Thousand Gallons
Production Hrs. Annual 7,344
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $331,966 5,096,131 kWh $0.07
Natural Gas $54,082 15,516 MMBtu $3.49
Fuel Oil #2 $13,604 2,881 MMBtu $4.72
TOTAL ENERGY COSTS $399,652
RECOMMENDED SAVINGS* $32,187 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,703
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$632
Cost:
$217
$632 9,672 - - - - - - $632
9,672
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$878
Cost:
$163
$878 13,482 - - - - - - $878
13,482
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,825
Cost:
$500
$2,209 33,998 - - - - $1,616 - $2,209
33,998
kWh
-
-
MMBtu
-
-
MMBtu
$1,616
-
$
04: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$19,722
Cost:
$115,000
$36,262 550,703 $(-7,360) (-2,112) - - $(-9,180) - $36,262
550,703
kWh
$(-7,360)
(-2,112)
MMBtu
-
-
MMBtu
$(-9,180)
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$3,985
Cost:
$1,910
$3,985 - - - - - - - $3,985
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$530
Cost:
$218
- - $423 121 $107 23 - - -
-
kWh
$423
121
MMBtu
$107
23
MMBtu
-
-
$
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$2,615
Cost:
$3,000
$2,615 40,152 - - - - - - $2,615
40,152
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,187
Cost:
$121,008
$46,581 648,007 $(-6,937) (-1,991) $107 23 $(-7,564) - $46,581
648,007
kWh
$(-6,937)
(-1,991)
MMBtu
$107
23
MMBtu
$(-7,564)
-
$
TOTAL IMPLEMENTED Savings:
$4,703
Cost:
$663
$3,087 47,480 - - - - $1,616 - $3,087
47,480
kWh
-
-
MMBtu
-
-
MMBtu
$1,616
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes