IAC logo
IAC Assessment: MA0197
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0197
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1990
Principal Product INJECTION MOLDED PARTS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 57
Plant Area (Sq.Ft.) 0
Annual Production 300,000 Pounds
Production Hrs. Annual 6,000
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $169,911 2,206,038 kWh $0.08
Natural Gas $25,921 4,083 MMBtu $6.35
TOTAL ENERGY COSTS $195,832
RECOMMENDED SAVINGS* $18,537 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,898
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$406
Cost:
$142
$406 5,275 - - $406
5,275
kWh
-
-
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,166
Cost:
$642
$1,004 13,189 $162 26 $1,004
13,189
kWh
$162
26
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,726
Cost:
$10,622
$6,726 87,339 - - $6,726
87,339
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$948
Cost:
$5,052
$948 12,309 - - $948
12,309
kWh
-
-
MMBtu
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$972
Cost:
-
$972 - - - $972
-
kWh
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,680
Cost:
$927
$2,505 32,532 $(-825) (-130) $2,505
32,532
kWh
$(-825)
(-130)
MMBtu
07: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$6,639
Cost:
$19,720
$1,083 14,068 $5,556 875 $1,083
14,068
kWh
$5,556
875
MMBtu
TOTAL RECOMMENDED Savings:
$18,537
Cost:
$37,105
$13,644 164,712 $4,893 771 $13,644
164,712
kWh
$4,893
771
MMBtu
TOTAL IMPLEMENTED Savings:
$11,898
Cost:
$17,385
$12,561 150,644 $(-663) (-104) $12,561
150,644
kWh
$(-663)
(-104)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas