IAC logo
IAC Assessment: MA0203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1991
Principal Product CORRUGATED CONTAINERS
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 380 Thousand Feet
Production Hrs. Annual 4,718
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $281,775 2,900,645 kWh $0.10
Natural Gas $107,034 25,597 MMBtu $4.18
Fuel Oil #4 $49,487 11,200 MMBtu $4.42
TOTAL ENERGY COSTS $438,296
RECOMMENDED SAVINGS* $34,335 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,335
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #4 Electricity Usage Natural Gas Fuel Oil #4
$ kWh $ MMBtu $ MMBtu
01: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$13,019
Cost:
$8,029
- - $8,516 2,037 $4,503 1,019 -
-
kWh
$8,516
2,037
MMBtu
$4,503
1,019
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,245
Cost:
$2,182
- - $4,956 1,186 $2,289 518 -
-
kWh
$4,956
1,186
MMBtu
$2,289
518
MMBtu
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$778
Cost:
$547
- - $532 127 $246 56 -
-
kWh
$532
127
MMBtu
$246
56
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,651
Cost:
$32,018
$12,651 130,129 - - - - $12,651
130,129
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$642
Cost:
$161
$642 6,741 - - - - $642
6,741
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$34,335
Cost:
$42,937
$13,293 136,870 $14,004 3,350 $7,038 1,593 $13,293
136,870
kWh
$14,004
3,350
MMBtu
$7,038
1,593
MMBtu
TOTAL IMPLEMENTED Savings:
$34,335
Cost:
$42,937
$13,293 136,870 $14,004 3,350 $7,038 1,593 $13,293
136,870
kWh
$14,004
3,350
MMBtu
$7,038
1,593
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #4 Electricity Usage Natural Gas Fuel Oil #4