IAC Assessment: MA0205
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0205
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1991
Principal Product CUSTOM BINDERS
NAICS n/a
SIC 2782 - Blankbooks And Looseleaf Binders
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 5,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $208,124 2,645,662 kWh $0.08
Other Energy $94,232 14,284 MMBtu $6.60
TOTAL ENERGY COSTS $302,356
RECOMMENDED SAVINGS* $32,001 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,001
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #4 Other Energy Electricity Usage Fuel Oil #4 Other Energy
$ kWh $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,259
Cost:
$13,297
$4,259 54,220 - - - - $4,259
54,220
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,448
Cost:
$161
$2,448 31,067 - - - - $2,448
31,067
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,115
Cost:
$4,000
- - - - $7,115 1,078 -
-
kWh
-
-
MMBtu
$7,115
1,078
MMBtu
04: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE Savings:
$15,928
Cost:
-
- - $(-78,304) (-17,210) $94,232 14,284 -
-
kWh
$(-78,304)
(-17,210)
MMBtu
$94,232
14,284
MMBtu
05: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$614
Cost:
$897
- - - - $614 93 -
-
kWh
-
-
MMBtu
$614
93
MMBtu
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,637
Cost:
-
$1,637 20,809 - - - - $1,637
20,809
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$32,001
Cost:
$18,355
$8,344 106,096 $(-78,304) (-17,210) $101,961 15,455 $8,344
106,096
kWh
$(-78,304)
(-17,210)
MMBtu
$101,961
15,455
MMBtu
TOTAL IMPLEMENTED Savings:
$32,001
Cost:
$18,355
$8,344 106,096 $(-78,304) (-17,210) $101,961 15,455 $8,344
106,096
kWh
$(-78,304)
(-17,210)
MMBtu
$101,961
15,455
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Fuel Oil #4 Other Energy Electricity Usage Fuel Oil #4 Other Energy