IAC logo
IAC Assessment: MA0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1991
Principal Product STAINLESS STEEL WIRE
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 122
Plant Area (Sq.Ft.) 0
Annual Production 2,500,000 Pounds
Production Hrs. Annual 6,000
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $510,606 5,990,621 kWh $0.09
Natural Gas $34,314 5,438 MMBtu $6.31
Fuel Oil #6 $28,927 6,954 MMBtu $4.16
TOTAL ENERGY COSTS $573,847
RECOMMENDED SAVINGS* $34,051 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$2,708
Cost:
$7,000
- - - - $2,708 651 - - -
-
kWh
-
-
MMBtu
$2,708
651
MMBtu
-
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$2,582
Cost:
-
$2,773 32,532 - - $2,309 555 $(-2,500) - $2,773
32,532
kWh
-
-
MMBtu
$2,309
555
MMBtu
$(-2,500)
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$246
Cost:
$212
$25 293 $221 35 - - - - $25
293
kWh
$221
35
MMBtu
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$911
Cost:
$485
$(-75) (-879) - - $986 237 - - $(-75)
(-879)
kWh
-
-
MMBtu
$986
237
MMBtu
-
-
$
05: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$11,500
Cost:
-
$16,062 188,453 $(-4,562) (-723) - - - - $16,062
188,453
kWh
$(-4,562)
(-723)
MMBtu
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,024
Cost:
$241
$1,024 12,016 - - - - - - $1,024
12,016
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,097
Cost:
-
$4,097 48,066 - - - - - - $4,097
48,066
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,983
Cost:
-
$11,016 129,250 - - - - $(-33) - $11,016
129,250
kWh
-
-
MMBtu
-
-
MMBtu
$(-33)
-
$
TOTAL RECOMMENDED Savings:
$34,051
Cost:
$7,938
$34,922 409,731 $(-4,341) (-688) $6,003 1,443 $(-2,533) - $34,922
409,731
kWh
$(-4,341)
(-688)
MMBtu
$6,003
1,443
MMBtu
$(-2,533)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes