IAC Assessment: MA0216
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0216
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1991
Principal Product LITHOGRAPH PLATES/ROLLS
NAICS n/a
SIC 2796 - Platemaking Services
Sales $10,000,000-$50,000,000
# of Employees 91
Plant Area (Sq.Ft.) 0
Annual Production 38,500 Thousand Feet
Production Hrs. Annual 6,000
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $549,763 6,750,586 kWh $0.08
Natural Gas $225,880 30,110 MMBtu $7.50
TOTAL ENERGY COSTS $775,643
RECOMMENDED SAVINGS* $29,196 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,196
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$9,534
Cost:
$22,880
$(-3,509) (-43,083) $13,043 1,739 $(-3,509)
(-43,083)
kWh
$13,043
1,739
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,750
Cost:
$23,400
$6,750 - - - $6,750
-
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,673
Cost:
$8,000
$6,673 82,943 - - $6,673
82,943
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,188
Cost:
$3,548
- - $3,188 425 -
-
kWh
$3,188
425
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$307
Cost:
$1,189
$307 3,810 - - $307
3,810
kWh
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,800
Cost:
$590
- - $1,800 240 -
-
kWh
$1,800
240
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$472
Cost:
$193
$472 5,862 - - $472
5,862
kWh
-
-
MMBtu
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$472
Cost:
$398
$472 5,862 - - $472
5,862
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$29,196
Cost:
$60,198
$11,165 55,394 $18,031 2,404 $11,165
55,394
kWh
$18,031
2,404
MMBtu
TOTAL IMPLEMENTED Savings:
$29,196
Cost:
$60,198
$11,165 55,394 $18,031 2,404 $11,165
55,394
kWh
$18,031
2,404
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas