IAC logo
IAC Assessment: MA0228
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0228
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1991
Principal Product LATEX FOAM MATTRESSES
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 119
Plant Area (Sq.Ft.) 0
Annual Production 19,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $506,670 5,998,828 kWh $0.08
Natural Gas $122,795 48,541 MMBtu $2.53
Fuel Oil #6 $88,280 4,134,248 MMBtu $0.02
TOTAL ENERGY COSTS $717,745
RECOMMENDED SAVINGS* $47,184 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,530
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$27,069
Cost:
-
- - $50,532 17,014 $(-23,463) (-9,274) - - -
-
kWh
$50,532
17,014
MMBtu
$(-23,463)
(-9,274)
MMBtu
-
-
$
02: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$8,647
Cost:
$5,000
$8,647 102,286 - - - - - - $8,647
102,286
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,534
Cost:
$2,000
$6,534 77,374 - - - - - - $6,534
77,374
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,585
Cost:
$15,000
$3,836 45,428 - - - - $(-251) - $3,836
45,428
kWh
-
-
MMBtu
-
-
MMBtu
$(-251)
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$891
Cost:
$400
$891 10,551 - - - - - - $891
10,551
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$458
Cost:
$430
- - $458 167 - - - - -
-
kWh
$458
167
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$47,184
Cost:
$22,830
$19,908 235,639 $50,990 17,181 $(-23,463) (-9,274) $(-251) - $19,908
235,639
kWh
$50,990
17,181
MMBtu
$(-23,463)
(-9,274)
MMBtu
$(-251)
-
$
TOTAL IMPLEMENTED Savings:
$16,530
Cost:
$7,830
$16,072 190,211 $458 167 - - - - $16,072
190,211
kWh
$458
167
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes