IAC Assessment: MA0277
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0277
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1993
Principal Product turbine blades and vanes
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 85,526
Annual Production 0 Units
Production Hrs. Annual 6,713
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $405,125 4,846,718 kWh $0.08
Natural Gas $72,272 10,907 MMBtu $6.63
TOTAL ENERGY COSTS $477,397
RECOMMENDED SAVINGS* $51,595 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,045
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$39,298
Cost:
$39,650
$39,298 470,106 - - $39,298
470,106
kWh
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,123
Cost:
$3,800
$7,742 92,614 $(-2,619) (-395) $7,742
92,614
kWh
$(-2,619)
(-395)
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,443
Cost:
$5,557
$4,443 53,048 - - $4,443
53,048
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,397
Cost:
$91
$1,397 16,706 - - $1,397
16,706
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$784
Cost:
$180
$784 9,379 - - $784
9,379
kWh
-
-
MMBtu
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$550
Cost:
$126
- - $550 83 -
-
kWh
$550
83
MMBtu
TOTAL RECOMMENDED Savings:
$51,595
Cost:
$49,404
$53,664 641,853 $(-2,069) (-312) $53,664
641,853
kWh
$(-2,069)
(-312)
MMBtu
TOTAL IMPLEMENTED Savings:
$51,045
Cost:
$49,278
$53,664 641,853 $(-2,619) (-395) $53,664
641,853
kWh
$(-2,619)
(-395)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas