Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1993 |
Principal Product | Optical filters and Coat |
NAICS | n/a |
SIC | 3826 - Analytical Instruments |
Sales | $1,000,000-$5,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 27,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 4,368 |
Location (State) | VT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $64,996 | 648,007 | kWh | $0.10 |
Coal | $2,501 | 348 | MMBtu | $7.19 |
TOTAL ENERGY COSTS | $67,497 | |||
RECOMMENDED SAVINGS* | $22,768 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,768 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Coal | Personnel Changes | Water Consumption | Electricity Usage | Fuel Oil #2 | Coal | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $12,463 Cost: $15,645 |
$(-676) | (-6,741) | - | - | - | - | - | - | $13,139 | - |
$(-676) (-6,741) kWh |
- - MMBtu |
- - MMBtu |
- - $ |
$13,139 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1333 CONVERT COMBUSTION EQUIPMENT TO BURN OIL |
Savings: $6,283 Cost: $6,250 |
- | - | $(-1,678) | (-261) | $2,501 | 348 | $5,460 | - | - | - |
- - kWh |
$(-1,678) (-261) MMBtu |
$2,501 348 MMBtu |
$5,460 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $1,851 Cost: $1,190 |
$1,851 | 18,464 | - | - | - | - | - | - | - | - |
$1,851 18,464 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,146 Cost: $3,034 |
$1,146 | 11,430 | - | - | - | - | - | - | - | - |
$1,146 11,430 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,025 Cost: $110 |
$1,025 | 12,016 | - | - | - | - | - | - | - | - |
$1,025 12,016 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,768 Cost: $26,229 |
$3,346 | 35,169 | $(-1,678) | (-261) | $2,501 | 348 | $5,460 | - | $13,139 | - | $3,346 35,169 kWh |
$(-1,678) (-261) MMBtu |
$2,501 348 MMBtu |
$5,460 - $ |
$13,139 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,768 Cost: $26,229 |
$3,346 | 35,169 | $(-1,678) | (-261) | $2,501 | 348 | $5,460 | - | $13,139 | - | $3,346 35,169 kWh |
$(-1,678) (-261) MMBtu |
$2,501 348 MMBtu |
$5,460 - $ |
$13,139 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Coal | Personnel Changes | Water Consumption | Electricity Usage | Fuel Oil #2 | Coal | Personnel Changes | Water Consumption |