IAC Assessment: MA0337
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0337
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1995
Principal Product motion transfer devices
NAICS n/a
SIC 3568 - Power Transmission Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 229
Plant Area (Sq.Ft.) 110,000
Annual Production 35,000,000 Pieces
Production Hrs. Annual 6,500
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $326,997 2,789,566 kWh $0.12
Natural Gas $20,828 2,394 MMBtu $8.70
TOTAL ENERGY COSTS $347,825
RECOMMENDED SAVINGS* $28,181 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,684
#|Description Savings
Cost
Status Electricity Usage Water Consumption Electricity Usage Water Consumption
$ kWh $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,934
Cost:
$44,000
$16,934 153,576 - - $16,934
153,576
kWh
-
-
Tgal
02: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$4,708
Cost:
$5,000
$(-220) (-1,172) $4,928 - $(-220)
(-1,172)
kWh
$4,928
-
Tgal
03: 2.6225 ELIMINATE THIRD SHIFT Savings:
$4,455
Cost:
-
$4,455 67,409 - - $4,455
67,409
kWh
-
-
Tgal
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$850
Cost:
$800
$850 9,379 - - $850
9,379
kWh
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$750
Cost:
$1,200
$750 5,275 - - $750
5,275
kWh
-
-
Tgal
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$484
Cost:
-
$484 7,327 - - $484
7,327
kWh
-
-
Tgal
TOTAL RECOMMENDED Savings:
$28,181
Cost:
$51,000
$23,253 241,794 $4,928 - $23,253
241,794
kWh
$4,928
-
Tgal
TOTAL IMPLEMENTED Savings:
$17,684
Cost:
$45,200
$17,684 158,851 - - $17,684
158,851
kWh
-
-
Tgal
Savings
Cost
$ kWh $ Tgal
Electricity Usage Water Consumption Electricity Usage Water Consumption