Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1995 |
Principal Product | Zinc Die Castings |
NAICS | n/a |
SIC | 3364 - Nonferrous Die-casting Exc. Aluminum |
Sales | $1,000,000-$5,000,000 |
# of Employees | 37 |
Plant Area (Sq.Ft.) | 11,188 |
Annual Production | 1,350,000 Pounds |
Production Hrs. Annual | 3,875 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $52,831 | 400,645 | kWh | $0.13 |
Natural Gas | $75,174 | 9,984 | MMBtu | $7.53 |
TOTAL ENERGY COSTS | $138,096 | |||
RECOMMENDED SAVINGS* | $42,694 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,942 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $26,616 Cost: $37,300 |
- | - | - | - | - | - | $26,616 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$26,616 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $8,446 Cost: $9,000 |
$(-661) | (-7,034) | - | - | $9,107 | 3,384,375 | - | - |
$(-661) (-7,034) kWh |
- - MMBtu |
$9,107 3,384,375 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,559 Cost: $3,300 |
$2,559 | 31,360 | - | - | - | - | - | - |
$2,559 31,360 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1115 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS |
Savings: $2,131 Cost: $1,750 |
- | - | $2,131 | 283 | - | - | - | - |
- - kWh |
$2,131 283 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,114 Cost: $6,330 |
$2,114 | 16,120 | - | - | - | - | - | - |
$2,114 16,120 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2514 COVER OPEN TANKS |
Savings: $828 Cost: $274 |
- | - | $828 | 88 | - | - | - | - |
- - kWh |
$828 88 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $42,694 Cost: $57,954 |
$4,012 | 40,446 | $2,959 | 371 | $9,107 | 3,384,375 | $26,616 | - | $4,012 40,446 kWh |
$2,959 371 MMBtu |
$9,107 3,384,375 Tgal |
$26,616 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,942 Cost: $6,604 |
$2,114 | 16,120 | $828 | 88 | - | - | - | - | $2,114 16,120 kWh |
$828 88 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Administrative Changes |