IAC Assessment: MA0344
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0344
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1995
Principal Product reflow ovens
NAICS n/a
SIC 3567 - Industrial Furnaces And Ovens
Sales $10,000,000-$50,000,000
# of Employees 98
Plant Area (Sq.Ft.) 33,000
Annual Production 250 Pieces
Production Hrs. Annual 4,862
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,047 565,358 kWh $0.12
LPG $19,324 1,955 MMBtu $9.88
TOTAL ENERGY COSTS $97,177
RECOMMENDED SAVINGS* $68,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,351
#|Description Savings
Cost
Status Electricity Usage LPG Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage LPG Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ MMBtu $ lb $ $ $ $ $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,107
Cost:
$2,446
$177 2,052 $5,930 602 - - - - - - - - $177
2,052
kWh
$5,930
602
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,398
Cost:
$24,197
$5,398 47,479 - - - - - - - - - - $5,398
47,479
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,909
Cost:
-
$2,909 32,532 - - - - - - - - - - $2,909
32,532
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,098
Cost:
$798
$1,098 9,965 - - - - - - - - - - $1,098
9,965
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$598
Cost:
-
- - - - - - $598 - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
$598
-
$
-
-
$
-
-
$
06: 2.7314 REDUCE VENTILATION AIR Savings:
$344
Cost:
-
$46 586 $298 30 - - - - - - - - $46
586
kWh
$298
30
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$22,500
Cost:
-
- - - - - - - - $22,500 - - - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
$22,500
-
$
-
-
$
08: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$16,229
Cost:
$4,500
- - - - - - - - $16,229 - - - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
$16,229
-
$
-
-
$
09: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$11,867
Cost:
$5,000
$(-1,276) (-6,155) - - - - - - - - $13,143 - $(-1,276)
(-6,155)
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$13,143
-
$
10: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,920
Cost:
-
- - - - $1,920 6,000 - - - - - - -
-
kWh
-
-
MMBtu
$1,920
6,000
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$68,970
Cost:
$36,941
$8,352 86,459 $6,228 632 $1,920 6,000 $598 - $38,729 - $13,143 - $8,352
86,459
kWh
$6,228
632
MMBtu
$1,920
6,000
lb
$598
-
$
$38,729
-
$
$13,143
-
$
TOTAL IMPLEMENTED Savings:
$4,351
Cost:
$798
$4,053 43,083 $298 30 - - - - - - - - $4,053
43,083
kWh
$298
30
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage LPG Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage LPG Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost