IAC logo
IAC Assessment: MA0350
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0350
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1995
Principal Product Metal Stampings
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 299
Plant Area (Sq.Ft.) 110,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 5,380
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $388,564 3,404,748 kWh $0.11
Natural Gas $26,676 3,210 MMBtu $8.31
Fuel Oil #2 $3,365 785 MMBtu $4.29
Fuel Oil #4 $4,745 1,195 MMBtu $3.97
TOTAL ENERGY COSTS $434,287
RECOMMENDED SAVINGS* $46,170 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,047
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Fuel Oil #4 Water Disposal Water Consumption Electricity Usage Natural Gas Fuel Oil #2 Fuel Oil #4 Water Disposal Water Consumption
$ kWh $ MMBtu $ MMBtu $ MMBtu $ Tgal $ Tgal
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$18,981
Cost:
$7,000
- - $11,689 1,506 $3,124 728 $4,168 1,106 - - - - -
-
kWh
$11,689
1,506
MMBtu
$3,124
728
MMBtu
$4,168
1,106
MMBtu
-
-
Tgal
-
-
Tgal
02: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$15,250
Cost:
$28,000
$19,394 125,147 $(-4,144) (-534) - - - - - - - - $19,394
125,147
kWh
$(-4,144)
(-534)
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,705
Cost:
$630
$6,705 77,960 - - - - - - - - - - $6,705
77,960
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,806
Cost:
$870
$1,806 17,878 - - - - - - - - - - $1,806
17,878
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,260
Cost:
$500
$1,260 14,654 - - - - - - - - - - $1,260
14,654
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,118
Cost:
$2,813
$1,118 10,551 - - - - - - - - - - $1,118
10,551
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$1,050
Cost:
$400
$(-212) (-2,052) - - - - - - $901 275,000 $361 - $(-212)
(-2,052)
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
$901
275,000
Tgal
$361
-
Tgal
TOTAL RECOMMENDED Savings:
$46,170
Cost:
$40,213
$30,071 244,138 $7,545 972 $3,124 728 $4,168 1,106 $901 275,000 $361 - $30,071
244,138
kWh
$7,545
972
MMBtu
$3,124
728
MMBtu
$4,168
1,106
MMBtu
$901
275,000
Tgal
$361
-
Tgal
TOTAL IMPLEMENTED Savings:
$22,047
Cost:
$8,370
$3,066 32,532 $11,689 1,506 $3,124 728 $4,168 1,106 - - - - $3,066
32,532
kWh
$11,689
1,506
MMBtu
$3,124
728
MMBtu
$4,168
1,106
MMBtu
-
-
Tgal
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ MMBtu $ Tgal $ Tgal
Electricity Usage Natural Gas Fuel Oil #2 Fuel Oil #4 Water Disposal Water Consumption Electricity Usage Natural Gas Fuel Oil #2 Fuel Oil #4 Water Disposal Water Consumption