Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1995 |
Principal Product | Metal Stampings |
NAICS | n/a |
SIC | 3469 - Metal Stampings, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 299 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 10,000,000 Pieces |
Production Hrs. Annual | 5,380 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $388,564 | 3,404,748 | kWh | $0.11 |
Natural Gas | $26,676 | 3,210 | MMBtu | $8.31 |
Fuel Oil #2 | $3,365 | 785 | MMBtu | $4.29 |
Fuel Oil #4 | $4,745 | 1,195 | MMBtu | $3.97 |
TOTAL ENERGY COSTS | $434,287 | |||
RECOMMENDED SAVINGS* | $46,170 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,047 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Fuel Oil #4 | Water Disposal | Water Consumption | Electricity Usage | Natural Gas | Fuel Oil #2 | Fuel Oil #4 | Water Disposal | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $18,981 Cost: $7,000 |
- | - | $11,689 | 1,506 | $3,124 | 728 | $4,168 | 1,106 | - | - | - | - |
- - kWh |
$11,689 1,506 MMBtu |
$3,124 728 MMBtu |
$4,168 1,106 MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS |
Savings: $15,250 Cost: $28,000 |
$19,394 | 125,147 | $(-4,144) | (-534) | - | - | - | - | - | - | - | - |
$19,394 125,147 kWh |
$(-4,144) (-534) MMBtu |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $6,705 Cost: $630 |
$6,705 | 77,960 | - | - | - | - | - | - | - | - | - | - |
$6,705 77,960 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,806 Cost: $870 |
$1,806 | 17,878 | - | - | - | - | - | - | - | - | - | - |
$1,806 17,878 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,260 Cost: $500 |
$1,260 | 14,654 | - | - | - | - | - | - | - | - | - | - |
$1,260 14,654 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,118 Cost: $2,813 |
$1,118 | 10,551 | - | - | - | - | - | - | - | - | - | - |
$1,118 10,551 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $1,050 Cost: $400 |
$(-212) | (-2,052) | - | - | - | - | - | - | $901 | 275,000 | $361 | - |
$(-212) (-2,052) kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
$901 275,000 Tgal |
$361 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $46,170 Cost: $40,213 |
$30,071 | 244,138 | $7,545 | 972 | $3,124 | 728 | $4,168 | 1,106 | $901 | 275,000 | $361 | - | $30,071 244,138 kWh |
$7,545 972 MMBtu |
$3,124 728 MMBtu |
$4,168 1,106 MMBtu |
$901 275,000 Tgal |
$361 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,047 Cost: $8,370 |
$3,066 | 32,532 | $11,689 | 1,506 | $3,124 | 728 | $4,168 | 1,106 | - | - | - | - | $3,066 32,532 kWh |
$11,689 1,506 MMBtu |
$3,124 728 MMBtu |
$4,168 1,106 MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Fuel Oil #4 | Water Disposal | Water Consumption | Electricity Usage | Natural Gas | Fuel Oil #2 | Fuel Oil #4 | Water Disposal | Water Consumption |