IAC Assessment: MA0363
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0363
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product Molded Plywood and Plastic Extrusions
NAICS n/a
SIC 2431 - Millwork
Sales $5,000,000-$10,000,000
# of Employees 61
Plant Area (Sq.Ft.) 54,775
Annual Production 24,000,000 Thousand Feet
Production Hrs. Annual 8,710
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $208,383 2,429,367 kWh $0.09
Electricity Demand $58,684 7,600 kW-months/year $7.72
Electricity Fees $4,144 - $ -
Natural Gas $15,935 2,547 MMBtu $6.26
TOTAL ENERGY COSTS $287,146
RECOMMENDED SAVINGS* $30,367 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,959
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,510
Cost:
$48,558
$7,824 89,097 $1,686 210 - - $7,824
89,097
kWh
$1,686
210
kW-months/year
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,694
Cost:
-
$7,694 90,856 - - - - $7,694
90,856
kWh
-
-
kW-months/year
-
-
$
03: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$7,680
Cost:
-
- - $7,680 994 - - -
-
kWh
$7,680
994
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,549
Cost:
$325
$2,549 33,998 - - - - $2,549
33,998
kWh
-
-
kW-months/year
-
-
$
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$1,801
Cost:
$4,300
$1,801 20,223 - - - - $1,801
20,223
kWh
-
-
kW-months/year
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$723
Cost:
$700
$723 8,206 - - - - $723
8,206
kWh
-
-
kW-months/year
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$410
Cost:
-
- - - - $410 - -
-
kWh
-
-
kW-months/year
$410
-
$
TOTAL RECOMMENDED Savings:
$30,367
Cost:
$53,883
$20,591 242,380 $9,366 1,204 $410 - $20,591
242,380
kWh
$9,366
1,204
kW-months/year
$410
-
$
TOTAL IMPLEMENTED Savings:
$2,959
Cost:
$325
$2,549 33,998 - - $410 - $2,549
33,998
kWh
-
-
kW-months/year
$410
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes