IAC logo
IAC Assessment: MA0368
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0368
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product Printed circuit boards
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 55,000
Annual Production 140,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,625 1,019,930 kWh $0.05
Electricity Demand $23,270 2,242 kW-months/year $10.38
Electricity Fees $7,646 - $ -
Natural Gas $82,286 14,682 MMBtu $5.60
TOTAL ENERGY COSTS $198,763
RECOMMENDED SAVINGS* $32,726 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,784
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$17,190
Cost:
$12,000
- - - - $17,190 4,800,000 -
-
kWh
-
-
MMBtu
$17,190
4,800,000
Tgal
02: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$8,710
Cost:
$25,500
$1,030 60,375 - - $7,680 1,920,000 $1,030
60,375
kWh
-
-
MMBtu
$7,680
1,920,000
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,509
Cost:
$11,189
$2,509 57,737 - - - - $2,509
57,737
kWh
-
-
MMBtu
-
-
Tgal
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$1,990
Cost:
$868
- - $1,990 548 - - -
-
kWh
$1,990
548
MMBtu
-
-
Tgal
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,042
Cost:
$2,804
$3,562 80,305 $(-1,520) (-304) - - $3,562
80,305
kWh
$(-1,520)
(-304)
MMBtu
-
-
Tgal
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$285
Cost:
$460
$285 14,947 - - - - $285
14,947
kWh
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$32,726
Cost:
$52,821
$7,386 213,364 $470 244 $24,870 6,720,000 $7,386
213,364
kWh
$470
244
MMBtu
$24,870
6,720,000
Tgal
TOTAL IMPLEMENTED Savings:
$4,784
Cost:
$12,517
$2,794 72,684 $1,990 548 - - $2,794
72,684
kWh
$1,990
548
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal