IAC Assessment: MA0369
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0369
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product solid state electronic packages
NAICS n/a
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 349
Plant Area (Sq.Ft.) 178,000
Annual Production 415,000 Units
Production Hrs. Annual 6,000
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $401,848 5,160,317 kWh $0.08
Electricity Demand $54,162 11,657 kW-months/year $4.65
Natural Gas $25,105 4,212 MMBtu $5.96
TOTAL ENERGY COSTS $483,615
RECOMMENDED SAVINGS* $43,484 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,805
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Gaseous Waste Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Gaseous Waste
$ kWh $ kW-months/year $ MMBtu $ lb $ lb
01: 4.2120 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$21,886
Cost:
$11,000
$(-2,100) (-22,274) - - - - - - $23,986 297,532 $(-2,100)
(-22,274)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$23,986
297,532
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,735
Cost:
$49,531
$11,735 170,574 - - - - - - - - $11,735
170,574
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,903
Cost:
$8,750
$12,892 322,392 - - $(-7,989) (-1,375) - - - - $12,892
322,392
kWh
-
-
kW-months/year
$(-7,989)
(-1,375)
MMBtu
-
-
lb
-
-
lb
04: 3.4145 USE MAGNETIC TECHNOLOGY TO TREAT WATER Savings:
$2,500
Cost:
$850
- - - - - - $2,500 300 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,500
300
lb
-
-
lb
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,541
Cost:
$3,401
$1,541 38,687 - - - - - - - - $1,541
38,687
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$919
Cost:
-
- - $919 102 - - - - - - -
-
kWh
$919
102
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
TOTAL RECOMMENDED Savings:
$43,484
Cost:
$73,532
$24,068 509,379 $919 102 $(-7,989) (-1,375) $2,500 300 $23,986 297,532 $24,068
509,379
kWh
$919
102
kW-months/year
$(-7,989)
(-1,375)
MMBtu
$2,500
300
lb
$23,986
297,532
lb
TOTAL IMPLEMENTED Savings:
$22,805
Cost:
$11,000
$(-2,100) (-22,274) $919 102 - - - - $23,986 297,532 $(-2,100)
(-22,274)
kWh
$919
102
kW-months/year
-
-
MMBtu
-
-
lb
$23,986
297,532
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Gaseous Waste Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Gaseous Waste