IAC Assessment: MA0375
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0375
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product Metal Platings, Fabricated Metal Furniture Parts, Baby Furni
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 48
Plant Area (Sq.Ft.) 140,000
Annual Production 0 Units
Production Hrs. Annual 2,375
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,685 1,875,440 kWh $0.06
Electricity Demand $64,498 6,720 kW-months/year $9.60
Electricity Fees $879 - $ -
Natural Gas $75,907 23,393 MMBtu $3.24
Fuel Oil #2 $8,845 1,749 MMBtu $5.06
Fuel Oil #6 $101,506 29,532 MMBtu $3.44
TOTAL ENERGY COSTS $365,320
RECOMMENDED SAVINGS* $70,502 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,021
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Other Liquid (haz) Solid Waste (haz) Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Other Liquid (haz) Solid Waste (haz) Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ gal $ lb $ $ $ $
01: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$7,468
Cost:
$4,677
$(-212) (-3,517) - - $3,546 1,200 $4,134 1,200 - - - - - - - - $(-212)
(-3,517)
kWh
-
-
kW-months/year
$3,546
1,200
MMBtu
$4,134
1,200
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,121
Cost:
$1,100
$2,121 31,360 - - - - - - - - - - - - - - $2,121
31,360
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$329
Cost:
-
$363 5,275 - - - - - - $(-34) 29 - - - - - - $363
5,275
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-34)
29
gal
-
-
lb
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$456
Cost:
$157
$456 6,741 - - - - - - - - - - - - - - $456
6,741
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$444
Cost:
$290
- - - - $141 47 $303 88 - - - - - - - - -
-
kWh
-
-
kW-months/year
$141
47
MMBtu
$303
88
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$683
Cost:
$1,590
- - - - $240 61 $443 112 - - - - - - - - -
-
kWh
-
-
kW-months/year
$240
61
MMBtu
$443
112
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$310
Cost:
$1,888
- - - - $310 105 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$310
105
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,823
Cost:
$47,265
$5,076 77,667 $3,747 379 - - - - - - - - - - - - $5,076
77,667
kWh
$3,747
379
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
09: 3.4145 USE MAGNETIC TECHNOLOGY TO TREAT WATER Savings:
$9,036
Cost:
$6,000
- - - - - - - - - - - - - - $9,036 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$9,036
-
$
10: 3.7391 IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION Savings:
$1,125
Cost:
$400
- - - - - - - - - - - - $1,125 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
$1,125
-
$
-
-
$
11: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$10,877
Cost:
$31,500
- - - - $(-604) (-204) $(-703) (-204) - - $12,184 128,250 - - - - -
-
kWh
-
-
kW-months/year
$(-604)
(-204)
MMBtu
$(-703)
(-204)
MMBtu
-
-
gal
$12,184
128,250
lb
-
-
$
-
-
$
12: 3.5242 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE Savings:
$28,830
Cost:
$97,000
- - - - - - - - - - - - $28,830 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
$28,830
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$70,502
Cost:
$191,867
$7,804 117,526 $3,747 379 $3,633 1,209 $4,177 1,196 $(-34) 29 $12,184 128,250 $29,955 - $9,036 - $7,804
117,526
kWh
$3,747
379
kW-months/year
$3,633
1,209
MMBtu
$4,177
1,196
MMBtu
$(-34)
29
gal
$12,184
128,250
lb
$29,955
-
$
$9,036
-
$
TOTAL IMPLEMENTED Savings:
$3,021
Cost:
$1,547
$2,577 38,101 - - $141 47 $303 88 - - - - - - - - $2,577
38,101
kWh
-
-
kW-months/year
$141
47
MMBtu
$303
88
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Other Liquid (haz) Solid Waste (haz) Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Other Liquid (haz) Solid Waste (haz) Primary Raw Material Ancillary Material Cost