IAC logo
IAC Assessment: MA0415
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0415
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1998
Principal Product Extruded/Molded PTFE
NAICS n/a
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 61,150
Annual Production 1,500,000 Pounds
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $178,387 2,667,644 kWh $0.07
Electricity Demand $91,421 6,596 kW-months/year $13.86
LPG $253,179 47,146 MMBtu $5.37
TOTAL ENERGY COSTS $522,987
RECOMMENDED SAVINGS* $177,045 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,498
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Electricity Usage Electricity Demand Electricity Fees LPG
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$47,834
Cost:
$5,100
$2,371 37,222 - - - - $45,463 8,466 $2,371
37,222
kWh
-
-
kW-months/year
-
-
$
$45,463
8,466
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$53,137
Cost:
$200,000
$27,492 431,125 $35,666 2,592 - - $(-10,021) (-1,839) $27,492
431,125
kWh
$35,666
2,592
kW-months/year
-
-
$
$(-10,021)
(-1,839)
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$62,915
Cost:
$200,000
$32,745 513,482 $42,106 3,060 - - $(-11,936) (-2,190) $32,745
513,482
kWh
$42,106
3,060
kW-months/year
-
-
$
$(-11,936)
(-2,190)
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,174
Cost:
$10,000
$4,956 77,960 - - - - $(-1,782) (-332) $4,956
77,960
kWh
-
-
kW-months/year
-
-
$
$(-1,782)
(-332)
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,748
Cost:
$2,019
- - - - - - $1,748 326 -
-
kWh
-
-
kW-months/year
-
-
$
$1,748
326
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,750
Cost:
$17,906
$4,747 74,443 $2,003 144 - - - - $4,747
74,443
kWh
$2,003
144
kW-months/year
-
-
$
-
-
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,487
Cost:
$5,700
- - - - $1,487 - - - -
-
kWh
-
-
kW-months/year
$1,487
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$177,045
Cost:
$440,725
$72,311 1,134,232 $79,775 5,796 $1,487 - $23,472 4,431 $72,311
1,134,232
kWh
$79,775
5,796
kW-months/year
$1,487
-
$
$23,472
4,431
MMBtu
TOTAL IMPLEMENTED Savings:
$8,498
Cost:
$19,925
$4,747 74,443 $2,003 144 - - $1,748 326 $4,747
74,443
kWh
$2,003
144
kW-months/year
-
-
$
$1,748
326
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees LPG Electricity Usage Electricity Demand Electricity Fees LPG