IAC logo
IAC Assessment: MA0421
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0421
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1998
Principal Product Malleable Gray Iron Castings
NAICS n/a
SIC 3322 - Malleable Iron Foundries
Sales $5,000,000-$10,000,000
# of Employees 135
Plant Area (Sq.Ft.) 116,000
Annual Production 9,458 Tons
Production Hrs. Annual 2,250
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,092 3,995,604 kWh $0.04
Electricity Demand $274,648 18,037 kW-months/year $15.23
Natural Gas $111,932 28,729 MMBtu $3.90
Coal $498,868 59,864 MMBtu $8.33
TOTAL ENERGY COSTS $1,059,540
RECOMMENDED SAVINGS* $602,015 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Coal Other Gas Electricity Usage Electricity Demand Natural Gas Coal Other Gas
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$471,027
Cost:
$984,000
- - - - $(-116,352) (-28,800) $616,881 71,151 $(-29,502) - -
-
kWh
-
-
kW-months/year
$(-116,352)
(-28,800)
MMBtu
$616,881
71,151
MMBtu
$(-29,502)
-
MMBtu
02: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$77,003
Cost:
$200,000
- - - - $(-108,061) (-26,682) $185,064 21,345 - - -
-
kWh
-
-
kW-months/year
$(-108,061)
(-26,682)
MMBtu
$185,064
21,345
MMBtu
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,397
Cost:
$5,000
- - $28,397 657 - - - - - - -
-
kWh
$28,397
657
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,501
Cost:
$22,284
$13,277 166,178 $7,224 922 - - - - - - $13,277
166,178
kWh
$7,224
922
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,035
Cost:
$9,615
$739 16,999 $1,296 90 - - - - - - $739
16,999
kWh
$1,296
90
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,867
Cost:
-
$1,867 45,135 - - - - - - - - $1,867
45,135
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$917
Cost:
$8,530
$917 21,102 - - - - - - - - $917
21,102
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
08: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$268
Cost:
$472
- - - - $268 67 - - - - -
-
kWh
-
-
kW-months/year
$268
67
MMBtu
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$602,015
Cost:
$1,229,901
$16,800 249,414 $36,917 1,669 $(-224,145) (-55,415) $801,945 92,496 $(-29,502) - $16,800
249,414
kWh
$36,917
1,669
kW-months/year
$(-224,145)
(-55,415)
MMBtu
$801,945
92,496
MMBtu
$(-29,502)
-
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Coal Other Gas Electricity Usage Electricity Demand Natural Gas Coal Other Gas