Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2001 |
Principal Product | Specialty and Technical grades of paper |
NAICS | n/a |
SIC | 2621 - Paper Mills |
Sales | $50,000,000-$100,000,000 |
# of Employees | 190 |
Plant Area (Sq.Ft.) | 231,600 |
Annual Production | 60,000,000 Pounds |
Production Hrs. Annual | 8,425 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,324,931 | 18,406,926 | kWh | $0.07 |
Electricity Demand | $353,333 | 39,617 | kW-months/year | $8.92 |
Electricity Fees | $62,356 | - | $ | - |
LPG | $87,744 | 12,011 | MMBtu | $7.31 |
Fuel Oil #6 | $1,224,997 | 248,407 | MMBtu | $4.93 |
TOTAL ENERGY COSTS | $3,055,383 | |||
RECOMMENDED SAVINGS* | $419,900 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $37,500 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Fuel Oil #6 | Electricity Usage | Electricity Demand | LPG | Fuel Oil #6 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $254,000 Cost: $120,000 |
$(-18,000) | (-251,000) | $(-3,000) | (-360) | - | - | $275,000 | 59,720 |
$(-18,000) (-251,000) kWh |
$(-3,000) (-360) kW-months/year |
- - MMBtu |
$275,000 59,720 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $62,000 Cost: $35,000 |
- | - | - | - | $62,000 | 7,900 | - | - |
- - kWh |
- - kW-months/year |
$62,000 7,900 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $54,400 Cost: $290,000 |
$61,400 | 852,200 | $17,000 | 1,895 | - | - | $(-24,000) | (-5,100) |
$61,400 852,200 kWh |
$17,000 1,895 kW-months/year |
- - MMBtu |
$(-24,000) (-5,100) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $15,500 Cost: $9,500 |
$15,500 | 215,400 | - | - | - | - | - | - |
$15,500 215,400 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,300 Cost: $12,000 |
$8,300 | 115,200 | - | - | - | - | - | - |
$8,300 115,200 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,000 Cost: $24,000 |
$12,000 | 170,000 | - | - | - | - | - | - |
$12,000 170,000 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,800 Cost: $51,800 |
$4,100 | 56,400 | $700 | 80 | - | - | - | - |
$4,100 56,400 kWh |
$700 80 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,700 Cost: - |
$3,700 | 51,000 | - | - | - | - | - | - |
$3,700 51,000 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,200 Cost: - |
$3,200 | 44,800 | - | - | - | - | - | - |
$3,200 44,800 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2123 INSULATE FEEDWATER TANK |
Savings: $2,000 Cost: $3,000 |
- | - | - | - | - | - | $2,000 | 440 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,000 440 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $419,900 Cost: $545,300 |
$90,200 | 1,254,000 | $14,700 | 1,615 | $62,000 | 7,900 | $253,000 | 55,060 | $90,200 1,254,000 kWh |
$14,700 1,615 kW-months/year |
$62,000 7,900 MMBtu |
$253,000 55,060 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $37,500 Cost: $76,300 |
$34,800 | 482,800 | $700 | 80 | - | - | $2,000 | 440 | $34,800 482,800 kWh |
$700 80 kW-months/year |
- - MMBtu |
$2,000 440 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Fuel Oil #6 | Electricity Usage | Electricity Demand | LPG | Fuel Oil #6 |