IAC logo
IAC Assessment: MA0501
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0501
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2001
Principal Product Newspaper and printed material
NAICS n/a
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 124
Plant Area (Sq.Ft.) 87,500
Annual Production 6,188 Tons
Production Hrs. Annual 7,852
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $171,855 2,048,400 kWh $0.08
Electricity Demand $51,954 7,222 kW-months/year $7.19
Electricity Fees $3,837 - $ -
Natural Gas $15,979 1,617 MMBtu $9.88
TOTAL ENERGY COSTS $245,450
RECOMMENDED SAVINGS* $35,103 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,884
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$11,983
Cost:
$6,000
- - $11,983 1,533 -
-
kWh
$11,983
1,533
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,653
Cost:
$46,540
$8,551 109,630 $1,102 168 $8,551
109,630
kWh
$1,102
168
kW-months/year
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,838
Cost:
$9,990
- - $5,838 890 -
-
kWh
$5,838
890
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,410
Cost:
$2,500
$4,410 56,534 - - $4,410
56,534
kWh
-
-
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,219
Cost:
$2,162
$2,219 27,673 - - $2,219
27,673
kWh
-
-
kW-months/year
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$736
Cost:
$300
$736 9,404 - - $736
9,404
kWh
-
-
kW-months/year
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$264
Cost:
-
$264 3,375 - - $264
3,375
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$35,103
Cost:
$67,492
$16,180 206,616 $18,923 2,591 $16,180
206,616
kWh
$18,923
2,591
kW-months/year
TOTAL IMPLEMENTED Savings:
$32,884
Cost:
$65,330
$13,961 178,943 $18,923 2,591 $13,961
178,943
kWh
$18,923
2,591
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand