Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2002 |
Principal Product | Silicon-Carbide Ceramic Wafer Holders |
NAICS | n/a |
SIC | 3297 - Nonclay Refractories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 139 |
Plant Area (Sq.Ft.) | 134,699 |
Annual Production | 1,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,501,662 | 18,980,471 | kWh | $0.08 |
Natural Gas | $82,088 | 15,119 | MMBtu | $5.43 |
TOTAL ENERGY COSTS | $1,583,750 | |||
RECOMMENDED SAVINGS* | $131,298 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Energy | Water Consumption | Electricity Usage | Natural Gas | Other Energy | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $55,391 Cost: $74,250 |
$55,391 | 1,035,341 | - | - | - | - | - | - |
$55,391 1,035,341 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4159 REPLACE TREATED WATER WITH WELL / SURFACE WATER |
Savings: $37,920 Cost: $18,500 |
- | - | - | - | - | - | $37,920 | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$37,920 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,893 Cost: $55,300 |
$18,893 | 353,146 | - | - | - | - | - | - |
$18,893 353,146 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $13,130 Cost: $25,484 |
- | - | $67,660 | 10,966 | $(-54,530) | (-12,337) | - | - |
- - kWh |
$67,660 10,966 MMBtu |
$(-54,530) (-12,337) MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $3,441 Cost: $5,848 |
$5,315 | 99,345 | - | - | $(-1,874) | (-424) | - | - |
$5,315 99,345 kWh |
- - MMBtu |
$(-1,874) (-424) MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,523 Cost: $2,000 |
$2,523 | 47,158 | - | - | - | - | - | - |
$2,523 47,158 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $131,298 Cost: $181,382 |
$82,122 | 1,534,990 | $67,660 | 10,966 | $(-56,404) | (-12,761) | $37,920 | - | $82,122 1,534,990 kWh |
$67,660 10,966 MMBtu |
$(-56,404) (-12,761) MMBtu |
$37,920 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Energy | Water Consumption | Electricity Usage | Natural Gas | Other Energy | Water Consumption |