IAC logo
IAC Assessment: MA0513
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0513
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Plastic tubing and coated fiberglass sleeving
NAICS n/a
SIC 2821 - Plastics Materials And Resins
Sales $5,000,000-$10,000,000
# of Employees 58
Plant Area (Sq.Ft.) 100,000
Annual Production 70,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $147,837 2,085,602 kWh $0.07
Electricity Demand $31,268 5,140 kW-months/year $6.08
Electricity Fees $4,673 - $ -
LPG $4,697 380 MMBtu $12.36
Fuel Oil #2 $44,412 9,723 MMBtu $4.57
TOTAL ENERGY COSTS $235,253
RECOMMENDED SAVINGS* $17,386 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,871
#|Description Savings
Cost
Status Electricity Usage LPG Fuel Oil #2 Electricity Usage LPG Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$10,252
Cost:
$10,000
$10,000 128,206 - - $252 48 $10,000
128,206
kWh
-
-
MMBtu
$252
48
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,583
Cost:
$10,000
- - - - $2,583 492 -
-
kWh
-
-
MMBtu
$2,583
492
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,565
Cost:
-
$2,565 32,889 - - - - $2,565
32,889
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,070
Cost:
$1,000
$1,070 13,712 - - - - $1,070
13,712
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$680
Cost:
$5,000
$2,009 25,759 $(-1,329) (-100) - - $2,009
25,759
kWh
$(-1,329)
(-100)
MMBtu
-
-
MMBtu
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$236
Cost:
$500
- - - - $236 45 -
-
kWh
-
-
MMBtu
$236
45
MMBtu
TOTAL RECOMMENDED Savings:
$17,386
Cost:
$26,500
$15,644 200,566 $(-1,329) (-100) $3,071 585 $15,644
200,566
kWh
$(-1,329)
(-100)
MMBtu
$3,071
585
MMBtu
TOTAL IMPLEMENTED Savings:
$3,871
Cost:
$1,500
$3,635 46,601 - - $236 45 $3,635
46,601
kWh
-
-
MMBtu
$236
45
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage LPG Fuel Oil #2 Electricity Usage LPG Fuel Oil #2