Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2002 |
Principal Product | Plastic tubing and coated fiberglass sleeving |
NAICS | n/a |
SIC | 2821 - Plastics Materials And Resins |
Sales | $5,000,000-$10,000,000 |
# of Employees | 58 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 70,000 Thousand Feet |
Production Hrs. Annual | 6,240 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $147,837 | 2,085,602 | kWh | $0.07 |
Electricity Demand | $31,268 | 5,140 | kW-months/year | $6.08 |
Electricity Fees | $4,673 | - | $ | - |
LPG | $4,697 | 380 | MMBtu | $12.36 |
Fuel Oil #2 | $44,412 | 9,723 | MMBtu | $4.57 |
TOTAL ENERGY COSTS | $235,253 | |||
RECOMMENDED SAVINGS* | $17,386 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,871 |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Fuel Oil #2 | Electricity Usage | LPG | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2212 USE MINIMUM SAFE OVEN VENTILATION |
Savings: $10,252 Cost: $10,000 |
$10,000 | 128,206 | - | - | $252 | 48 |
$10,000 128,206 kWh |
- - MMBtu |
$252 48 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,583 Cost: $10,000 |
- | - | - | - | $2,583 | 492 |
- - kWh |
- - MMBtu |
$2,583 492 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,565 Cost: - |
$2,565 | 32,889 | - | - | - | - |
$2,565 32,889 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,070 Cost: $1,000 |
$1,070 | 13,712 | - | - | - | - |
$1,070 13,712 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $680 Cost: $5,000 |
$2,009 | 25,759 | $(-1,329) | (-100) | - | - |
$2,009 25,759 kWh |
$(-1,329) (-100) MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $236 Cost: $500 |
- | - | - | - | $236 | 45 |
- - kWh |
- - MMBtu |
$236 45 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,386 Cost: $26,500 |
$15,644 | 200,566 | $(-1,329) | (-100) | $3,071 | 585 | $15,644 200,566 kWh |
$(-1,329) (-100) MMBtu |
$3,071 585 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,871 Cost: $1,500 |
$3,635 | 46,601 | - | - | $236 | 45 | $3,635 46,601 kWh |
- - MMBtu |
$236 45 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Fuel Oil #2 | Electricity Usage | LPG | Fuel Oil #2 |