IAC Assessment: MA0518
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0518
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Paper
NAICS n/a
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 130,000
Annual Production 13,000,000 Pounds
Production Hrs. Annual 6,936
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $245,075 6,634,500 kWh $0.04
Electricity Demand $236,030 16,716 kW-months/year $14.12
Electricity Fees $117,355 - $ -
Natural Gas $438,609 69,585 MMBtu $6.30
Fuel Oil #2 $5,760 766 MMBtu $7.52
TOTAL ENERGY COSTS $1,042,829
RECOMMENDED SAVINGS* $68,564 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,251
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$27,840
Cost:
$56,000
- - - - - - $27,840 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$27,840
-
$
02: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$26,093
Cost:
$28,000
- - - - $9,252 1,661 $16,841 - -
-
kWh
-
-
kW-months/year
$9,252
1,661
MMBtu
$16,841
-
$
03: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$7,380
Cost:
$34,000
$(-940) (-25,506) - - - - $8,320 - $(-940)
(-25,506)
kWh
-
-
kW-months/year
-
-
MMBtu
$8,320
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,756
Cost:
$4,000
$2,259 61,312 $1,497 106 - - - - $2,259
61,312
kWh
$1,497
106
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$2,648
Cost:
$1,250
$1,589 43,119 $1,059 75 - - - - $1,589
43,119
kWh
$1,059
75
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2123 INSULATE FEEDWATER TANK Savings:
$847
Cost:
$1,000
- - - - $847 152 - - -
-
kWh
-
-
kW-months/year
$847
152
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$68,564
Cost:
$124,250
$2,908 78,925 $2,556 181 $10,099 1,813 $53,001 - $2,908
78,925
kWh
$2,556
181
kW-months/year
$10,099
1,813
MMBtu
$53,001
-
$
TOTAL IMPLEMENTED Savings:
$7,251
Cost:
$6,250
$3,848 104,431 $2,556 181 $847 152 - - $3,848
104,431
kWh
$2,556
181
kW-months/year
$847
152
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production