Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2002 |
Principal Product | Paper |
NAICS | n/a |
SIC | 2621 - Paper Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 13,000,000 Pounds |
Production Hrs. Annual | 6,936 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $245,075 | 6,634,500 | kWh | $0.04 |
Electricity Demand | $236,030 | 16,716 | kW-months/year | $14.12 |
Electricity Fees | $117,355 | - | $ | - |
Natural Gas | $438,609 | 69,585 | MMBtu | $6.30 |
Fuel Oil #2 | $5,760 | 766 | MMBtu | $7.52 |
TOTAL ENERGY COSTS | $1,042,829 | |||
RECOMMENDED SAVINGS* | $68,564 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,251 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $27,840 Cost: $56,000 |
- | - | - | - | - | - | $27,840 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$27,840 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $26,093 Cost: $28,000 |
- | - | - | - | $9,252 | 1,661 | $16,841 | - |
- - kWh |
- - kW-months/year |
$9,252 1,661 MMBtu |
$16,841 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS |
Savings: $7,380 Cost: $34,000 |
$(-940) | (-25,506) | - | - | - | - | $8,320 | - |
$(-940) (-25,506) kWh |
- - kW-months/year |
- - MMBtu |
$8,320 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,756 Cost: $4,000 |
$2,259 | 61,312 | $1,497 | 106 | - | - | - | - |
$2,259 61,312 kWh |
$1,497 106 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $2,648 Cost: $1,250 |
$1,589 | 43,119 | $1,059 | 75 | - | - | - | - |
$1,589 43,119 kWh |
$1,059 75 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2123 INSULATE FEEDWATER TANK |
Savings: $847 Cost: $1,000 |
- | - | - | - | $847 | 152 | - | - |
- - kWh |
- - kW-months/year |
$847 152 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $68,564 Cost: $124,250 |
$2,908 | 78,925 | $2,556 | 181 | $10,099 | 1,813 | $53,001 | - | $2,908 78,925 kWh |
$2,556 181 kW-months/year |
$10,099 1,813 MMBtu |
$53,001 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,251 Cost: $6,250 |
$3,848 | 104,431 | $2,556 | 181 | $847 | 152 | - | - | $3,848 104,431 kWh |
$2,556 181 kW-months/year |
$847 152 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | By-product Production |