Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2003 |
Principal Product | Non-ferrous wire |
NAICS | 331420 - Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3357 - Nonferrous Wiredrawing & Insulating |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 105,000 |
Annual Production | 30,000,000 Pounds |
Production Hrs. Annual | 6,200 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $200,952 | 3,606,400 | kWh | $0.06 |
Electricity Demand | $85,665 | 10,320 | kW-months/year | $8.30 |
Natural Gas | $53,433 | 63,325 | MMBtu | $0.84 |
TOTAL ENERGY COSTS | $340,050 | |||
RECOMMENDED SAVINGS* | $171,584 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,064 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $94,545 Cost: $112,240 |
$121,641 | 2,145,000 | $39,928 | 4,714 | $(-67,024) | (-8,134) | - | - | - | - |
$121,641 2,145,000 kWh |
$39,928 4,714 kW-months/year |
$(-67,024) (-8,134) MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $61,752 Cost: $240,000 |
$(-9,894) | (-174,600) | $(-15,165) | (-1,790) | - | - | $87,811 | - | $(-1,000) | - |
$(-9,894) (-174,600) kWh |
$(-15,165) (-1,790) kW-months/year |
- - MMBtu |
$87,811 - $ |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $11,180 Cost: $8,000 |
- | - | $11,180 | 1,320 | - | - | - | - | - | - |
- - kWh |
$11,180 1,320 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,446 Cost: $10,396 |
$2,198 | 15,200 | $248 | 29 | - | - | - | - | - | - |
$2,198 15,200 kWh |
$248 29 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION |
Savings: $1,043 Cost: $3,500 |
$1,043 | 18,400 | - | - | - | - | - | - | - | - |
$1,043 18,400 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $464 Cost: $150 |
$464 | 7,600 | - | - | - | - | - | - | - | - |
$464 7,600 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $154 Cost: - |
$154 | 3,200 | - | - | - | - | - | - | - | - |
$154 3,200 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $171,584 Cost: $374,286 |
$115,606 | 2,014,800 | $36,191 | 4,273 | $(-67,024) | (-8,134) | $87,811 | - | $(-1,000) | - | $115,606 2,014,800 kWh |
$36,191 4,273 kW-months/year |
$(-67,024) (-8,134) MMBtu |
$87,811 - $ |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,064 Cost: $10,546 |
$2,816 | 26,000 | $248 | 29 | - | - | - | - | - | - | $2,816 26,000 kWh |
$248 29 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | By-product Production |