IAC logo
IAC Assessment: MA0546
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0546
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2004
Principal Product Ceramic and metal components
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 192
Plant Area (Sq.Ft.) 60,000
Annual Production 0 Units
Production Hrs. Annual 87,112
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $352,224 3,696,200 kWh $0.10
Electricity Demand $25,980 8,776 kW-months/year $2.96
Electricity Fees $4,320 - $ -
Natural Gas $55,558 7,278 MMBtu $7.63
TOTAL ENERGY COSTS $457,457
RECOMMENDED SAVINGS* $57,852 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,397
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ MMBtu $ Tgal $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$16,130
Cost:
$4,480
$16,130 181,700 - - - - - - $16,130
181,700
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
02: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$13,348
Cost:
$4,712
- - - - $10,378 2,613,600 $2,970 - -
-
kWh
-
-
MMBtu
$10,378
2,613,600
Tgal
$2,970
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,157
Cost:
$1,992
$11,157 122,600 - - - - - - $11,157
122,600
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.7314 REDUCE VENTILATION AIR Savings:
$7,495
Cost:
$1,200
$4,457 50,700 $3,038 378 - - - - $4,457
50,700
kWh
$3,038
378
MMBtu
-
-
Tgal
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,827
Cost:
$4,972
$3,827 42,200 - - - - - - $3,827
42,200
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,243
Cost:
$3,230
- - $2,243 279 - - - - -
-
kWh
$2,243
279
MMBtu
-
-
Tgal
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,839
Cost:
$282
$1,839 20,900 - - - - - - $1,839
20,900
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$981
Cost:
$720
- - $981 122 - - - - -
-
kWh
$981
122
MMBtu
-
-
Tgal
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$832
Cost:
$3,000
$832 8,700 - - - - - - $832
8,700
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$57,852
Cost:
$24,588
$38,242 426,800 $6,262 779 $10,378 2,613,600 $2,970 - $38,242
426,800
kWh
$6,262
779
MMBtu
$10,378
2,613,600
Tgal
$2,970
-
$
TOTAL IMPLEMENTED Savings:
$14,397
Cost:
$12,402
$9,116 101,600 $5,281 657 - - - - $9,116
101,600
kWh
$5,281
657
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Natural Gas Water Disposal Ancillary Material Cost