Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2004 |
Principal Product | Ceramic and metal components |
NAICS | 334419 - Other Electronic Component Manufacturing |
SIC | 3679 - Electronic Components, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 192 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 87,112 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $352,224 | 3,696,200 | kWh | $0.10 |
Electricity Demand | $25,980 | 8,776 | kW-months/year | $2.96 |
Electricity Fees | $4,320 | - | $ | - |
Natural Gas | $55,558 | 7,278 | MMBtu | $7.63 |
TOTAL ENERGY COSTS | $457,457 | |||
RECOMMENDED SAVINGS* | $57,852 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $14,397 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $16,130 Cost: $4,480 |
$16,130 | 181,700 | - | - | - | - | - | - |
$16,130 181,700 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $13,348 Cost: $4,712 |
- | - | - | - | $10,378 | 2,613,600 | $2,970 | - |
- - kWh |
- - MMBtu |
$10,378 2,613,600 Tgal |
$2,970 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $11,157 Cost: $1,992 |
$11,157 | 122,600 | - | - | - | - | - | - |
$11,157 122,600 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7314 REDUCE VENTILATION AIR |
Savings: $7,495 Cost: $1,200 |
$4,457 | 50,700 | $3,038 | 378 | - | - | - | - |
$4,457 50,700 kWh |
$3,038 378 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,827 Cost: $4,972 |
$3,827 | 42,200 | - | - | - | - | - | - |
$3,827 42,200 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,243 Cost: $3,230 |
- | - | $2,243 | 279 | - | - | - | - |
- - kWh |
$2,243 279 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,839 Cost: $282 |
$1,839 | 20,900 | - | - | - | - | - | - |
$1,839 20,900 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $981 Cost: $720 |
- | - | $981 | 122 | - | - | - | - |
- - kWh |
$981 122 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $832 Cost: $3,000 |
$832 | 8,700 | - | - | - | - | - | - |
$832 8,700 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $57,852 Cost: $24,588 |
$38,242 | 426,800 | $6,262 | 779 | $10,378 | 2,613,600 | $2,970 | - | $38,242 426,800 kWh |
$6,262 779 MMBtu |
$10,378 2,613,600 Tgal |
$2,970 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $14,397 Cost: $12,402 |
$9,116 | 101,600 | $5,281 | 657 | - | - | - | - | $9,116 101,600 kWh |
$5,281 657 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost |