IAC Assessment: MA0565
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0565
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2004
Principal Product Composite decking
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 40,000
Annual Production 27,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,581 2,536,240 kWh $0.06
Electricity Demand $40,612 4,843 kW-months/year $8.39
Electricity Fees $781 - $ -
Natural Gas $49,700 4,625 MMBtu $10.75
TOTAL ENERGY COSTS $250,674
RECOMMENDED SAVINGS* $285,622 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $279,878
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Raw Material One-time Revenue or Avoided Cost Electricity Usage Natural Gas Primary Raw Material One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $ $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$216,000
Cost:
$125,000
- - - - - - $216,000 - -
-
kWh
-
-
MMBtu
-
-
$
$216,000
-
$
02: 4.125 Savings:
$57,540
Cost:
$40,000
$(-2,660) (-35,300) - - $60,200 - - - $(-2,660)
(-35,300)
kWh
-
-
MMBtu
$60,200
-
$
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,088
Cost:
$8,000
$5,088 67,800 - - - - - - $5,088
67,800
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.1224 REPLACE BOILER Savings:
$2,760
Cost:
$750
- - $2,760 259 - - - - -
-
kWh
$2,760
259
MMBtu
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,705
Cost:
$754
- - $2,705 254 - - - - -
-
kWh
$2,705
254
MMBtu
-
-
$
-
-
$
06: 2.2123 INSULATE FEEDWATER TANK Savings:
$873
Cost:
$300
- - $873 82 - - - - -
-
kWh
$873
82
MMBtu
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$656
Cost:
$548
$656 8,709 - - - - - - $656
8,709
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$285,622
Cost:
$175,352
$3,084 41,209 $6,338 595 $60,200 - $216,000 - $3,084
41,209
kWh
$6,338
595
MMBtu
$60,200
-
$
$216,000
-
$
TOTAL IMPLEMENTED Savings:
$279,878
Cost:
$166,804
$(-2,660) (-35,300) $6,338 595 $60,200 - $216,000 - $(-2,660)
(-35,300)
kWh
$6,338
595
MMBtu
$60,200
-
$
$216,000
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Primary Raw Material One-time Revenue or Avoided Cost Electricity Usage Natural Gas Primary Raw Material One-time Revenue or Avoided Cost