IAC Assessment: MA0594
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0594
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2006
Principal Product Light conveyor belting
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 127
Plant Area (Sq.Ft.) 200,000
Annual Production 1,300 Thousand Feet
Production Hrs. Annual 6,257
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $479,969 7,576,603 kWh $0.06
Electricity Demand $107,506 20,595 kW-months/year $5.22
Electricity Fees $3,000 - $ -
Natural Gas $575,581 70,420 MMBtu $8.17
LPG $7,244 45 MMBtu $160.98
Fuel Oil #4 $202,741 25,128 MMBtu $8.07
TOTAL ENERGY COSTS $1,376,041
RECOMMENDED SAVINGS* $239,891 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $182,407
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #4 Electricity Usage Electricity Demand Natural Gas Fuel Oil #4
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$123,147
Cost:
$15,525
- - - - $123,147 14,750 - - -
-
kWh
-
-
kW-months/year
$123,147
14,750
MMBtu
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$49,354
Cost:
$121,835
$46,368 579,600 $2,986 572 - - - - $46,368
579,600
kWh
$2,986
572
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$40,484
Cost:
$141,413
$(-2,016) (-25,200) - - $42,500 4,885 - - $(-2,016)
(-25,200)
kWh
-
-
kW-months/year
$42,500
4,885
MMBtu
-
-
MMBtu
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$11,241
Cost:
$7,665
- - - - $6,201 696 $5,040 359 -
-
kWh
-
-
kW-months/year
$6,201
696
MMBtu
$5,040
359
MMBtu
05: 2.7314 REDUCE VENTILATION AIR Savings:
$5,860
Cost:
$3,505
$1,248 15,600 - - $4,612 552 - - $1,248
15,600
kWh
-
-
kW-months/year
$4,612
552
MMBtu
-
-
MMBtu
06: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$4,046
Cost:
-
$4,046 50,576 - - - - - - $4,046
50,576
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,159
Cost:
$5,681
- - - - $3,159 355 - - -
-
kWh
-
-
kW-months/year
$3,159
355
MMBtu
-
-
MMBtu
08: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$2,600
Cost:
$500
$2,600 32,326 - - - - - - $2,600
32,326
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$239,891
Cost:
$296,124
$52,246 652,902 $2,986 572 $179,619 21,238 $5,040 359 $52,246
652,902
kWh
$2,986
572
kW-months/year
$179,619
21,238
MMBtu
$5,040
359
MMBtu
TOTAL IMPLEMENTED Savings:
$182,407
Cost:
$140,865
$51,662 645,776 $2,986 572 $127,759 15,302 - - $51,662
645,776
kWh
$2,986
572
kW-months/year
$127,759
15,302
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Fuel Oil #4 Electricity Usage Electricity Demand Natural Gas Fuel Oil #4