IAC logo
IAC Assessment: MA0600
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0600
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2006
Principal Product Newspaper
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2711 - Newspapers
Sales $1,000,000-$5,000,000
# of Employees 150
Plant Area (Sq.Ft.) 70,000
Annual Production 3,000 Tons
Production Hrs. Annual 7,300
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $163,594 2,050,800 kWh $0.08
Electricity Demand $42,341 5,442 kW-months/year $7.78
Natural Gas $16,578 1,390 MMBtu $11.93
TOTAL ENERGY COSTS $222,513
RECOMMENDED SAVINGS* $46,991 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT Savings:
$24,000
Cost:
-
- - $24,000 300 -
-
kWh
$24,000
300
kW-months/year
02: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$8,271
Cost:
$12,700
$7,231 81,250 $1,040 133 $7,231
81,250
kWh
$1,040
133
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,209
Cost:
$17,438
$5,431 61,030 $778 100 $5,431
61,030
kWh
$778
100
kW-months/year
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,321
Cost:
$10,000
- - $5,321 684 -
-
kWh
$5,321
684
kW-months/year
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,683
Cost:
$2,000
$1,683 18,909 - - $1,683
18,909
kWh
-
-
kW-months/year
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,507
Cost:
$5,000
$1,317 14,800 $190 24 $1,317
14,800
kWh
$190
24
kW-months/year
TOTAL RECOMMENDED Savings:
$46,991
Cost:
$47,138
$15,662 175,989 $31,329 1,241 $15,662
175,989
kWh
$31,329
1,241
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year