Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2006 |
Principal Product | Die Cast Products |
NAICS | 331523 - Nonferrous Metal Die-Casting Foundries |
SIC | 3364 - Nonferrous Die-casting Exc. Aluminum |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 75,000 |
Annual Production | 9,000,000 Pounds |
Production Hrs. Annual | 4,905 |
Location (State) | RI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $156,684 | 1,768,800 | kWh | $0.09 |
Electricity Demand | $21,934 | 6,667 | kW-months/year | $3.29 |
Natural Gas | $334,038 | 33,346 | MMBtu | $10.02 |
TOTAL ENERGY COSTS | $512,656 | |||
RECOMMENDED SAVINGS* | $89,548 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $32,657 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $33,327 Cost: $2,600 |
- | - | - | - | $1,369 | 109 | $38,400 | - | $(-6,442) | - |
- - kWh |
- - kW-months/year |
$1,369 109 MMBtu |
$38,400 - $ |
$(-6,442) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $20,912 Cost: $14,335 |
- | - | - | - | $20,912 | 1,664 | - | - | - | - |
- - kWh |
- - kW-months/year |
$20,912 1,664 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $14,796 Cost: $67,450 |
$14,796 | 123,300 | - | - | - | - | - | - | - | - |
$14,796 123,300 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6226 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE |
Savings: $8,539 Cost: $8,050 |
$8,184 | 68,200 | $355 | 93 | - | - | - | - | - | - |
$8,184 68,200 kWh |
$355 93 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,518 Cost: $12,500 |
$5,124 | 42,700 | $394 | 104 | - | - | - | - | - | - |
$5,124 42,700 kWh |
$394 104 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,250 Cost: $8,000 |
- | - | $3,250 | 988 | - | - | - | - | - | - |
- - kWh |
$3,250 988 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,206 Cost: $13,536 |
$2,976 | 24,800 | $230 | 61 | - | - | - | - | - | - |
$2,976 24,800 kWh |
$230 61 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $89,548 Cost: $126,471 |
$31,080 | 259,000 | $4,229 | 1,246 | $22,281 | 1,773 | $38,400 | - | $(-6,442) | - | $31,080 259,000 kWh |
$4,229 1,246 kW-months/year |
$22,281 1,773 MMBtu |
$38,400 - $ |
$(-6,442) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $32,657 Cost: $35,921 |
$11,160 | 93,000 | $585 | 154 | $20,912 | 1,664 | - | - | - | - | $11,160 93,000 kWh |
$585 154 kW-months/year |
$20,912 1,664 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost |