Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2006 |
Principal Product | Water and solvent based urethanes |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 2821 - Plastics Materials And Resins |
Sales | $10,000,000-$50,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 98,300 |
Annual Production | 1,000 Thousand Gallons |
Production Hrs. Annual | 4,368 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $15,019 | 4,400,640 | kWh | $0.00 |
Electricity Demand | $77,728 | 10,160 | kW-months/year | $7.65 |
Natural Gas | $515,674 | 39,902 | MMBtu | $12.92 |
TOTAL ENERGY COSTS | $608,421 | |||
RECOMMENDED SAVINGS* | $117,759 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $54,922 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $38,346 Cost: $38,000 |
- | - | - | - | $38,346 | 2,968 |
- - kWh |
- - kW-months/year |
$38,346 2,968 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $35,557 Cost: $91,980 |
$32,253 | 398,190 | $3,304 | 732 | - | - |
$32,253 398,190 kWh |
$3,304 732 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $20,310 Cost: $45,000 |
- | - | - | - | $20,310 | 1,572 |
- - kWh |
- - kW-months/year |
$20,310 1,572 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $15,294 Cost: $36,000 |
$13,543 | 167,200 | $1,751 | 229 | - | - |
$13,543 167,200 kWh |
$1,751 229 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $4,181 Cost: $83,000 |
$4,463 | 55,100 | $2,754 | 360 | $(-3,036) | (-235) |
$4,463 55,100 kWh |
$2,754 360 kW-months/year |
$(-3,036) (-235) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,784 Cost: $150 |
$1,417 | 17,500 | $367 | 48 | - | - |
$1,417 17,500 kWh |
$367 48 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,575 Cost: $2,925 |
- | - | - | - | $1,575 | 122 |
- - kWh |
- - kW-months/year |
$1,575 122 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $712 Cost: $1,500 |
$567 | 7,000 | $145 | 19 | - | - |
$567 7,000 kWh |
$145 19 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $117,759 Cost: $298,555 |
$52,243 | 644,990 | $8,321 | 1,388 | $57,195 | 4,427 | $52,243 644,990 kWh |
$8,321 1,388 kW-months/year |
$57,195 4,427 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $54,922 Cost: $132,555 |
$47,780 | 589,890 | $5,567 | 1,028 | $1,575 | 122 | $47,780 589,890 kWh |
$5,567 1,028 kW-months/year |
$1,575 122 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |