Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2007
Principal Product Silicone extrusions moldings
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 28,000
Annual Production 100,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,339 746,091 kWh $0.10
Electricity Demand $35,876 3,025 kW-months/year $11.86
Electricity Fees $4,314 - $ -
LPG $14,896 1,012 MMBtu $14.72
TOTAL ENERGY COSTS $133,425
RECOMMENDED SAVINGS* $25,369 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,996
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes By-product Production Electricity Usage Electricity Demand Personnel Changes By-product Production
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,053
Cost:
$49,555
$6,857 65,300 $2,196 188 - - - - $6,857
65,300
kWh
$2,196
188
kW-months/year
-
-
$
-
-
$
02: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$5,760
Cost:
$7,600
- - - - - - $5,760 - -
-
kWh
-
-
kW-months/year
-
-
$
$5,760
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,399
Cost:
$10,600
$4,399 41,900 - - - - - - $4,399
41,900
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,743
Cost:
$4,700
$4,263 40,600 - - $(-520) - - - $4,263
40,600
kWh
-
-
kW-months/year
$(-520)
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,320
Cost:
$2,782
$2,320 22,100 - - - - - - $2,320
22,100
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$94
Cost:
$100
$94 900 - - - - - - $94
900
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,369
Cost:
$75,337
$17,933 170,800 $2,196 188 $(-520) - $5,760 - $17,933
170,800
kWh
$2,196
188
kW-months/year
$(-520)
-
$
$5,760
-
$
TOTAL IMPLEMENTED Savings:
$13,996
Cost:
$23,000
$8,756 83,400 - - $(-520) - $5,760 - $8,756
83,400
kWh
-
-
kW-months/year
$(-520)
-
$
$5,760
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes By-product Production Electricity Usage Electricity Demand Personnel Changes By-product Production