IAC logo
IAC Assessment: MA0613
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0613
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2007
Principal Product Printed circuit boards
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 121
Plant Area (Sq.Ft.) 52,548
Annual Production 345,000 Pieces
Production Hrs. Annual 4,550
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,785 1,653,504 kWh $0.10
Electricity Demand $52,787 5,662 kW-months/year $9.32
Electricity Fees $7,451 - $ -
Paper $49,986 2,759 MMBtu $18.12
TOTAL ENERGY COSTS $269,009
RECOMMENDED SAVINGS* $66,323 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,915
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Paper Electricity Usage Electricity Demand Paper
$ kWh $ kW-months/year $ MMBtu
01: 2.7314 REDUCE VENTILATION AIR Savings:
$22,488
Cost:
$15,475
$7,543 69,200 $1,091 127 $13,854 765 $7,543
69,200
kWh
$1,091
127
kW-months/year
$13,854
765
MMBtu
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$15,346
Cost:
$54,617
$15,088 138,427 $258 30 - - $15,088
138,427
kWh
$258
30
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,574
Cost:
$53,250
$6,268 57,500 $1,306 152 - - $6,268
57,500
kWh
$1,306
152
kW-months/year
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$20,408
Cost:
$15,900
$11,303 103,700 $1,770 206 $7,335 (-405) $11,303
103,700
kWh
$1,770
206
kW-months/year
$7,335
(-405)
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$507
Cost:
$256
- - - - $507 28 -
-
kWh
-
-
kW-months/year
$507
28
MMBtu
TOTAL RECOMMENDED Savings:
$66,323
Cost:
$139,498
$40,202 368,827 $4,425 515 $21,696 388 $40,202
368,827
kWh
$4,425
515
kW-months/year
$21,696
388
MMBtu
TOTAL IMPLEMENTED Savings:
$45,915
Cost:
$123,598
$28,899 265,127 $2,655 309 $14,361 793 $28,899
265,127
kWh
$2,655
309
kW-months/year
$14,361
793
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Paper Electricity Usage Electricity Demand Paper