IAC logo
IAC Assessment: MA0623
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0623
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2007
Principal Product Silicone and metal products
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 30,000
Annual Production 96,000 Pieces
Production Hrs. Annual 2,730
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,340 1,084,320 kWh $0.13
Electricity Demand $39,006 4,224 kW-months/year $9.23
Electricity Fees $8,085 - $ -
Natural Gas $24,816 1,616 MMBtu $15.36
TOTAL ENERGY COSTS $208,247
RECOMMENDED SAVINGS* $27,151 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,940
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$13,848
Cost:
$117,000
$13,268 105,300 $7,476 810 $(-6,896) (-449) $13,268
105,300
kWh
$7,476
810
kW-months/year
$(-6,896)
(-449)
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,363
Cost:
$50,282
$4,813 38,200 $1,550 168 - - $4,813
38,200
kWh
$1,550
168
kW-months/year
-
-
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$6,297
Cost:
$1,184
- - - - $6,297 410 -
-
kWh
-
-
kW-months/year
$6,297
410
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$643
Cost:
$460
$643 5,100 - - - - $643
5,100
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,151
Cost:
$168,926
$18,724 148,600 $9,026 978 $(-599) (-39) $18,724
148,600
kWh
$9,026
978
kW-months/year
$(-599)
(-39)
MMBtu
TOTAL IMPLEMENTED Savings:
$6,940
Cost:
$1,644
$643 5,100 - - $6,297 410 $643
5,100
kWh
-
-
kW-months/year
$6,297
410
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas