Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2007 |
Principal Product | Silicone and metal products |
NAICS | 339112 - Surgical and Medical Instrument Manufacturing |
SIC | 3841 - Surgical And Medical Instruments |
Sales | $5,000,000-$10,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 96,000 Pieces |
Production Hrs. Annual | 2,730 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $136,340 | 1,084,320 | kWh | $0.13 |
Electricity Demand | $39,006 | 4,224 | kW-months/year | $9.23 |
Electricity Fees | $8,085 | - | $ | - |
Natural Gas | $24,816 | 1,616 | MMBtu | $15.36 |
TOTAL ENERGY COSTS | $208,247 | |||
RECOMMENDED SAVINGS* | $27,151 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,940 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $13,848 Cost: $117,000 |
$13,268 | 105,300 | $7,476 | 810 | $(-6,896) | (-449) |
$13,268 105,300 kWh |
$7,476 810 kW-months/year |
$(-6,896) (-449) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,363 Cost: $50,282 |
$4,813 | 38,200 | $1,550 | 168 | - | - |
$4,813 38,200 kWh |
$1,550 168 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $6,297 Cost: $1,184 |
- | - | - | - | $6,297 | 410 |
- - kWh |
- - kW-months/year |
$6,297 410 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $643 Cost: $460 |
$643 | 5,100 | - | - | - | - |
$643 5,100 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,151 Cost: $168,926 |
$18,724 | 148,600 | $9,026 | 978 | $(-599) | (-39) | $18,724 148,600 kWh |
$9,026 978 kW-months/year |
$(-599) (-39) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,940 Cost: $1,644 |
$643 | 5,100 | - | - | $6,297 | 410 | $643 5,100 kWh |
- - kW-months/year |
$6,297 410 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |