IAC Assessment: MA0638
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0638
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2008
Principal Product Bandages and tapes
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3842 - Surgical Appliances And Supplies
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 51,000
Annual Production 2,500,000 Pieces
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $247,838 1,987,600 kWh $0.12
Electricity Demand $31,508 4,738 kW-months/year $6.65
Natural Gas $314,151 22,375 MMBtu $14.04
TOTAL ENERGY COSTS $593,497
RECOMMENDED SAVINGS* $98,375 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,021
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$43,903
Cost:
$225,000
- - - - $43,903 3,127 -
-
kWh
-
-
kW-months/year
$43,903
3,127
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$23,075
Cost:
$56,000
$34,320 274,560 $3,511 528 $(-14,756) (-1,054) $34,320
274,560
kWh
$3,511
528
kW-months/year
$(-14,756)
(-1,054)
MMBtu
03: 2.7314 REDUCE VENTILATION AIR Savings:
$12,360
Cost:
$2,500
- - - - $12,360 881 -
-
kWh
-
-
kW-months/year
$12,360
881
MMBtu
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$6,135
Cost:
$20,000
- - - - $6,135 437 -
-
kWh
-
-
kW-months/year
$6,135
437
MMBtu
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,325
Cost:
$8,800
$(-673) (-5,382) - - $4,998 356 $(-673)
(-5,382)
kWh
-
-
kW-months/year
$4,998
356
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,428
Cost:
$16,500
$3,668 29,349 $332 50 $(-1,572) (-112) $3,668
29,349
kWh
$332
50
kW-months/year
$(-1,572)
(-112)
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,761
Cost:
-
$1,615 12,920 $146 22 - - $1,615
12,920
kWh
$146
22
kW-months/year
-
-
MMBtu
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,670
Cost:
$3,000
- - - - $1,670 119 -
-
kWh
-
-
kW-months/year
$1,670
119
MMBtu
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,488
Cost:
$2,450
- - - - $1,488 106 -
-
kWh
-
-
kW-months/year
$1,488
106
MMBtu
10: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$1,230
Cost:
$2,000
$1,230 9,450 - - - - $1,230
9,450
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$98,375
Cost:
$336,250
$40,160 320,897 $3,989 600 $54,226 3,860 $40,160
320,897
kWh
$3,989
600
kW-months/year
$54,226
3,860
MMBtu
TOTAL IMPLEMENTED Savings:
$17,021
Cost:
$7,500
$2,845 22,370 $146 22 $14,030 1,000 $2,845
22,370
kWh
$146
22
kW-months/year
$14,030
1,000
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas