Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2008 |
Principal Product | Bandages and tapes |
NAICS | 339113 - Surgical Appliance and Supplies Manufacturing |
SIC | 3842 - Surgical Appliances And Supplies |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 51,000 |
Annual Production | 2,500,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $247,838 | 1,987,600 | kWh | $0.12 |
Electricity Demand | $31,508 | 4,738 | kW-months/year | $6.65 |
Natural Gas | $314,151 | 22,375 | MMBtu | $14.04 |
TOTAL ENERGY COSTS | $593,497 | |||
RECOMMENDED SAVINGS* | $98,375 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,021 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS |
Savings: $43,903 Cost: $225,000 |
- | - | - | - | $43,903 | 3,127 |
- - kWh |
- - kW-months/year |
$43,903 3,127 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $23,075 Cost: $56,000 |
$34,320 | 274,560 | $3,511 | 528 | $(-14,756) | (-1,054) |
$34,320 274,560 kWh |
$3,511 528 kW-months/year |
$(-14,756) (-1,054) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7314 REDUCE VENTILATION AIR |
Savings: $12,360 Cost: $2,500 |
- | - | - | - | $12,360 | 881 |
- - kWh |
- - kW-months/year |
$12,360 881 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $6,135 Cost: $20,000 |
- | - | - | - | $6,135 | 437 |
- - kWh |
- - kW-months/year |
$6,135 437 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $4,325 Cost: $8,800 |
$(-673) | (-5,382) | - | - | $4,998 | 356 |
$(-673) (-5,382) kWh |
- - kW-months/year |
$4,998 356 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $2,428 Cost: $16,500 |
$3,668 | 29,349 | $332 | 50 | $(-1,572) | (-112) |
$3,668 29,349 kWh |
$332 50 kW-months/year |
$(-1,572) (-112) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,761 Cost: - |
$1,615 | 12,920 | $146 | 22 | - | - |
$1,615 12,920 kWh |
$146 22 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,670 Cost: $3,000 |
- | - | - | - | $1,670 | 119 |
- - kWh |
- - kW-months/year |
$1,670 119 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,488 Cost: $2,450 |
- | - | - | - | $1,488 | 106 |
- - kWh |
- - kW-months/year |
$1,488 106 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING |
Savings: $1,230 Cost: $2,000 |
$1,230 | 9,450 | - | - | - | - |
$1,230 9,450 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $98,375 Cost: $336,250 |
$40,160 | 320,897 | $3,989 | 600 | $54,226 | 3,860 | $40,160 320,897 kWh |
$3,989 600 kW-months/year |
$54,226 3,860 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,021 Cost: $7,500 |
$2,845 | 22,370 | $146 | 22 | $14,030 | 1,000 | $2,845 22,370 kWh |
$146 22 kW-months/year |
$14,030 1,000 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |