Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2011 |
Principal Product | Aluminum cans |
NAICS | 332431 - Metal Can Manufacturing |
SIC | 3411 - Metal Cans |
Sales | $100,000,000-$500,000,000 |
# of Employees | 215 |
Plant Area (Sq.Ft.) | 290,000 |
Annual Production | 2,147,483,647 Pieces |
Production Hrs. Annual | 8,640 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $3,314,852 | 40,414,021 | kWh | $0.08 |
Electricity Demand | $195,417 | 59,665 | kW-months/year | $3.28 |
Natural Gas | $1,278,095 | 200,793 | MMBtu | $6.37 |
TOTAL ENERGY COSTS | $4,788,364 | |||
RECOMMENDED SAVINGS* | $178,214 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $178,214 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $70,691 Cost: $20,000 |
$8,141 | 99,282 | $62,550 | 9,835 |
$8,141 99,282 kWh |
$62,550 9,835 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $45,173 Cost: $20,100 |
$10,384 | 126,637 | $34,789 | 5,470 |
$10,384 126,637 kWh |
$34,789 5,470 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $24,174 Cost: $55,000 |
- | - | $24,174 | 3,801 |
- - kWh |
$24,174 3,801 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $17,015 Cost: $30,000 |
$24,704 | 301,273 | $(-7,689) | (-1,209) |
$24,704 301,273 kWh |
$(-7,689) (-1,209) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $12,376 Cost: $55,750 |
$12,376 | 150,932 | - | - |
$12,376 150,932 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $8,785 Cost: $11,650 |
$8,785 | 107,136 | - | - |
$8,785 107,136 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $178,214 Cost: $192,500 |
$64,390 | 785,260 | $113,824 | 17,897 | $64,390 785,260 kWh |
$113,824 17,897 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $178,214 Cost: $192,500 |
$64,390 | 785,260 | $113,824 | 17,897 | $64,390 785,260 kWh |
$113,824 17,897 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |