IAC logo
IAC Assessment: MA0679
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0679
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2011
Principal Product Aluminum cans
NAICS 332431 - Metal Can Manufacturing
SIC 3411 - Metal Cans
Sales $100,000,000-$500,000,000
# of Employees 215
Plant Area (Sq.Ft.) 290,000
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 8,640
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,314,852 40,414,021 kWh $0.08
Electricity Demand $195,417 59,665 kW-months/year $3.28
Natural Gas $1,278,095 200,793 MMBtu $6.37
TOTAL ENERGY COSTS $4,788,364
RECOMMENDED SAVINGS* $178,214 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $178,214
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$70,691
Cost:
$20,000
$8,141 99,282 $62,550 9,835 $8,141
99,282
kWh
$62,550
9,835
MMBtu
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$45,173
Cost:
$20,100
$10,384 126,637 $34,789 5,470 $10,384
126,637
kWh
$34,789
5,470
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$24,174
Cost:
$55,000
- - $24,174 3,801 -
-
kWh
$24,174
3,801
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$17,015
Cost:
$30,000
$24,704 301,273 $(-7,689) (-1,209) $24,704
301,273
kWh
$(-7,689)
(-1,209)
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$12,376
Cost:
$55,750
$12,376 150,932 - - $12,376
150,932
kWh
-
-
MMBtu
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$8,785
Cost:
$11,650
$8,785 107,136 - - $8,785
107,136
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$178,214
Cost:
$192,500
$64,390 785,260 $113,824 17,897 $64,390
785,260
kWh
$113,824
17,897
MMBtu
TOTAL IMPLEMENTED Savings:
$178,214
Cost:
$192,500
$64,390 785,260 $113,824 17,897 $64,390
785,260
kWh
$113,824
17,897
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas