IAC logo
IAC Assessment: MA0699
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0699
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2012
Principal Product Tantalum capacitors
NAICS 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3675 - Electronic Capacitors
Sales $10,000,000-$50,000,000
# of Employees 158
Plant Area (Sq.Ft.) 64,000
Annual Production 760,000 Pieces
Production Hrs. Annual 6,240
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $214,442 2,993,941 kWh $0.07
Electricity Demand $131,780 7,557 kW-months/year $17.44
Fuel Oil #2 $64,172 2,455 MMBtu $26.14
TOTAL ENERGY COSTS $412,284
RECOMMENDED SAVINGS* $53,597 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,742
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$25,140
Cost:
$9,900
$13,272 184,334 - - $11,868 454 $13,272
184,334
kWh
-
-
kW-months/year
$11,868
454
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,627
Cost:
$104,325
$13,559 188,320 $6,068 348 - - $13,559
188,320
kWh
$6,068
348
kW-months/year
-
-
MMBtu
03: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$5,019
Cost:
$24,000
$5,019 69,709 - - - - $5,019
69,709
kWh
-
-
kW-months/year
-
-
MMBtu
04: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$1,855
Cost:
$500
$1,855 25,776 - - - - $1,855
25,776
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$1,250
Cost:
$6,500
$1,250 17,365 - - - - $1,250
17,365
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$706
Cost:
$100
$706 9,811 - - - - $706
9,811
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$53,597
Cost:
$145,325
$35,661 495,315 $6,068 348 $11,868 454 $35,661
495,315
kWh
$6,068
348
kW-months/year
$11,868
454
MMBtu
TOTAL IMPLEMENTED Savings:
$51,742
Cost:
$144,825
$33,806 469,539 $6,068 348 $11,868 454 $33,806
469,539
kWh
$6,068
348
kW-months/year
$11,868
454
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2