Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2012 |
Principal Product | Tantalum capacitors |
NAICS | 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3675 - Electronic Capacitors |
Sales | $10,000,000-$50,000,000 |
# of Employees | 158 |
Plant Area (Sq.Ft.) | 64,000 |
Annual Production | 760,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | VT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $214,442 | 2,993,941 | kWh | $0.07 |
Electricity Demand | $131,780 | 7,557 | kW-months/year | $17.44 |
Fuel Oil #2 | $64,172 | 2,455 | MMBtu | $26.14 |
TOTAL ENERGY COSTS | $412,284 | |||
RECOMMENDED SAVINGS* | $53,597 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $51,742 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Electricity Usage | Electricity Demand | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $25,140 Cost: $9,900 |
$13,272 | 184,334 | - | - | $11,868 | 454 |
$13,272 184,334 kWh |
- - kW-months/year |
$11,868 454 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $19,627 Cost: $104,325 |
$13,559 | 188,320 | $6,068 | 348 | - | - |
$13,559 188,320 kWh |
$6,068 348 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS |
Savings: $5,019 Cost: $24,000 |
$5,019 | 69,709 | - | - | - | - |
$5,019 69,709 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $1,855 Cost: $500 |
$1,855 | 25,776 | - | - | - | - |
$1,855 25,776 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING |
Savings: $1,250 Cost: $6,500 |
$1,250 | 17,365 | - | - | - | - |
$1,250 17,365 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $706 Cost: $100 |
$706 | 9,811 | - | - | - | - |
$706 9,811 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $53,597 Cost: $145,325 |
$35,661 | 495,315 | $6,068 | 348 | $11,868 | 454 | $35,661 495,315 kWh |
$6,068 348 kW-months/year |
$11,868 454 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $51,742 Cost: $144,825 |
$33,806 | 469,539 | $6,068 | 348 | $11,868 | 454 | $33,806 469,539 kWh |
$6,068 348 kW-months/year |
$11,868 454 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Electricity Usage | Electricity Demand | Fuel Oil #2 |