Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2014
Principal Product Composite parts
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 22
Plant Area (Sq.Ft.) 18,000
Annual Production 16 Pieces
Production Hrs. Annual 5,279
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,229 1,059,120 kWh $0.11
Electricity Demand $67,062 4,214 kW-months/year $15.91
Electricity Fees $15,514 - $ -
Natural Gas $6,131 479 MMBtu $12.80
TOTAL ENERGY COSTS $203,936
RECOMMENDED SAVINGS* $21,153 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,222
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$11,551
Cost:
$200
- - $11,551 - -
-
kWh
$11,551
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,120
Cost:
$8,225
$7,120 65,437 - - $7,120
65,437
kWh
-
-
$
03: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$1,931
Cost:
$4,020
$1,931 17,751 - - $1,931
17,751
kWh
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$551
Cost:
$1,688
$551 5,068 - - $551
5,068
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$21,153
Cost:
$14,133
$9,602 88,256 $11,551 - $9,602
88,256
kWh
$11,551
-
$
TOTAL IMPLEMENTED Savings:
$19,222
Cost:
$10,113
$7,671 70,505 $11,551 - $7,671
70,505
kWh
$11,551
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes