IAC Assessment: MA0750
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0750
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2015
Principal Product Medical instruments
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 98
Plant Area (Sq.Ft.) 60,000
Annual Production 24,000 Pieces
Production Hrs. Annual 4,394
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $195,509 1,492,400 kWh $0.13
Electricity Demand $26,709 3,962 kW-months/year $6.74
Electricity Fees $6,600 - $ -
Fuel Oil #2 $128,168 4,773 MMBtu $26.85
TOTAL ENERGY COSTS $356,986
RECOMMENDED SAVINGS* $67,990 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.7314 REDUCE VENTILATION AIR Savings:
$18,184
Cost:
$10,420
$409 3,121 $17,775 662 $409
3,121
kWh
$17,775
662
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$16,398
Cost:
$7,000
$8,074 61,637 $8,324 310 $8,074
61,637
kWh
$8,324
310
MMBtu
03: 2.7314 REDUCE VENTILATION AIR Savings:
$15,229
Cost:
$15,000
$3,389 25,867 $11,840 441 $3,389
25,867
kWh
$11,840
441
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,208
Cost:
$3,000
$6,208 47,392 - - $6,208
47,392
kWh
-
-
MMBtu
05: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$5,289
Cost:
$2,500
- - $5,289 197 -
-
kWh
$5,289
197
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,138
Cost:
$9,144
$3,138 23,956 - - $3,138
23,956
kWh
-
-
MMBtu
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,007
Cost:
$1,500
- - $3,007 112 -
-
kWh
$3,007
112
MMBtu
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$537
Cost:
$100
- - $537 20 -
-
kWh
$537
20
MMBtu
TOTAL RECOMMENDED Savings:
$67,990
Cost:
$48,664
$21,218 161,973 $46,772 1,742 $21,218
161,973
kWh
$46,772
1,742
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2